BACKGROUND
The current City of Auburn Design Standards, Surface Water Management Manual, and Engineering
Construction Standards should be used when designing a development project within the City of Auburn. In
special cases, City standards may not best address a particular engineering application. In these instances,
a design deviation from the City’s standards may be requested from the City Engineer. All such requests
shall include applicable engineering justification for the deviation. Deviation requests and supporting
justification must be sealed by a licensed professional civil engineer.
It is recommended that prior to submitting an application for a deviation you consult with a Development
Review Engineer to discuss your proposal. Please contact the City of Auburn Community Development main
line at (253) 931-3090 and ask to speak to someone from Development for more information.
INSTRUCTIONS
Please attach a Deviation Request Letter. The letter should include a reference to the applicable section(s) of
the Design Standards, Engineering Construction Standards, or Surface Water Management Manual.
The letter will also require detailed supporting justification for the design element deviation proposal for
each of the following criteria outlined in Section 1.03 of the City of Auburn Design Standards:
1. Functional intent
2. Safety factors
3. Operational concerns
4. Maintenance concerns
5. Liability concerns
6. Capabilities and/or efficiencies
7. The design life, historical performance, and durability
8. The aesthetic and visual impacts
9. The cost effectiveness and availability of any replacement components or materials
10. Consistency with the spirit and purpose of the corresponding City design standard
11. Demonstration that the environment will not be adversely affected
12. Supported by published industry standards
The letter should include any maps, photos, drawings, or exhibits as necessary to support the above
justification and be sealed by a licensed professional civil engineer.
If a deviation to more than one standard is being requested, each deviation should be numbered, listed, and
justified by the above criteria separately.
DECISIONS
In accordance with 1.03 of the City of Auburn Design Standards, the City Engineer will evaluate the deviation
request and notify the applicant of the decision within fifteen (15) working days of the receipt of a complete
deviation request.
SURFACE WATER MANAGEMENT MANUAL DEVIATIONS
Note that any request for deviation of any of the Minimum Requirements of the Surface Water Management
Manual will be reviewed through a different process than the above. These requests are required to be
submitted and reviewed in accordance with ACC 13.48.226 and will require a public notice period. Please
reference ACC 13.48.226 and Section 1.03.2.2 of the City of Auburn Design Standards for more information
about this process.