Page Revision Date _________________
The roles and responsibilities of internal and external responders should be defined and clarified by
these agreements. Written agreements, if obtained, are included in Appendix E. If any State or
local authorities declined to provide emergency response assistance, this has been documented in
the facility operating record and may also be included in Appendix E.
This facility has contracted for the services of a spill response contractor.
Name of Spill Response Contractor
Briefly describe arrangements with the spill response contractor, including when to call for
assistance, how to call for assistance and what response services will be provided. More detailed
information may be provided in Appendix F.
Copies of this contingency plan and all revisions have been submitted to the response agencies
referenced above and in Appendix D. A revision log is maintained in Appendix D.
6. Evacuation Plans
Description of evacuation plans including signal(s) to be used, primary and secondary evacuation
routes, and safe assembly areas (if designated). Facility diagrams with evacuation routes annotated
may substitute for the written description and should be included in Appendix G.
7. Location of 90-day and Satellite Accumulation Areas
The location of all (permanent and temporary) 90-day container and/or tank storage areas and
satellite accumulation areas must be designated in the contingency plan. Facility diagrams with
accumulation/storage areas annotated may be included in Appendix H or you may include a list of
storage areas below (for example: Building 10, Room 19 – 90-day storage area; Room 32A – 3
satellite accumulation areas; Lab 11 – 1 satellite accumulation area).