include a finished, intended product with basic material requirements, including color, shade,
perspiration, and fabric.
6. Suggested sources (if applicable):
a. Identify sources used during R&D development and bridge contract information.
7. Price estimate to include:
a. Unit cost based on previous items or prototype.
8. Engineering Drawing (primarily for equipment items ):
a. Equipment drawings to include interfaces, tubes, dimensions, different size factors, materials,
materials of core capability, and core functionality.
b. Patterns for equipment with drawings for each size.
9. In accordance with TROOP SUPPORT C&T 4125.1/AR 70-29/NAVSUPINST 4454.2/AFR 74-
12/MCO 4855.3, Production Testing of TROOP SUPPORT C&T Managed Items, the following
information shall be addressed for all new items entering the TROOP SUPPORT C&T supply system
except when previously agreed to between TROOP SUPPORT and the Services that the information is
not required:
a. Suggested number of production test contracts.
b. Suggested minimum quantities.
c. Suggested list of contractors.
d. Estimated production unit cost.
e. List of new or special production equipment.
f. Identification of long lead time or short supply materials or components.
g. Recommendations regarding critical and/or desire in-process production control points or
procedures.
h. “State of the Art” precautions highlighted during development process.
i. Work statement delineating potential problem areas.
j. Certification that:
1. Research and engineering phase completed.
2. Specification is ready for production tests, Expanded First Article (EFA), or
mass production. (EFA is a procedure where the adaptability of a new
specification to mass production is validated through the simultaneous
acquisition of production test and supply quantities of an item utilizing
economic manufacturing practices)
k. A recommendation for establishment of a qualified products list when life support items are to
be procured.
Note: Army Natick provides a transition letter to LSO that includes all of this information with the exception of
items a. and b.
Additional items that may be included in the TDP:
10. Hubs/dies, molds, models, cartoons, special tools and/or production lasts.
11. Engineering support information as required by TROOP SUPPORT C&T 3200.1/PAM 715-
13/NAVSUPINST 4120.30A/AFI 21-408/MCO 4000.18, Engineering Support Instruction for Items
Supplied by Defense Logistics Agency. [NOTE: Currently being revised and will be referred to as
JESI 3200.1 (Joint Engineering Support Instruction)].
12. Additional definitions and detailed information on specific steps can be found in TROOP
SUPPORT C&T 4140.34/AR 32-5/NAVSUPINST 4410.3F/MCO 10120.31F/AFR 67-145, Introduction
of New Clothing and Textile (C&T) Items into the Department of Defense (DoD) Supply System.