Step 4: Stake Proposed Improvements
o
Property is to be Staked within 4 days of submitting application.
o
Mark the location of all proposed structures (including cistern, well, & septic) on your property, using brightly
colored and labeled (i.e. “NW corner of residence”) stakes. In most instance, only the four outermost corners are
needed.
o
Proposed access to the building site are to be staked down the centerline every 20 feet. Include dimensions of
parking areas and the dimensions of emergency turn-out and turn-arounds.
o
During the months of October through April, stakes must protrude at least 4 feet above ground to clear snow cover.
o
If your proposal is on an undeveloped parcel, please mark the location for the driveway entrance in a manner that is
clearly visible from the access road. A small sign with the applicant’ s name is helpful for staff to locate the site.
o
Additions and accessory buildings must also be staked on the property.
Additional Submittals:
As part of your Site Plan Review determination, the following items might be required prior to issuance of a building
permit, although they are not required with your initial application. Your Pre-Application Conference planner will point
out which items will be most applicable to your specific project.
o
Revegetation/Erosion Control Plan - Formulate a plan consistent with the Land Use publication titled Revegetation.
o
Lighting Plan for all Exterior Lighting - A plan as indicated in Land Use publication titled Lighting Requirements.
o
Color Chips/Samples - Indicating exterior roofing and siding colors (these samples must be flat and able to fit in an
8.5” x 22” file folder).
o
Wildfire Mitigation - A Wildfire Mitigation Plan or Wildfire Partners Assessment Report will be required prior to the
issuance of a BP. Only landowners or homeowners that are a Certified Forester, a Boulder County Wildfire Mitigation
Specialist, or a Wildfire Partner’s Wildfire Mitigation Specialist may complete these documents. If you are not a Certified
Forester, a Wildfire Mitigation Specialist will be assigned to you.
Supplied Land Use Publications (to be filled out by the Pre-Application Conference Planner):
o
o
o
Revegetation
Lighting
Elevations
o
o
o
Grading
Fire Access/Cistern
Building Lot Determination
o
o
o
Home Occupation
Building Height
PMJM
Certification:
I certify that the information submitted is complete and correct. I agree to clearly mark the property (if not addressed
or already built on) and the location of the proposed structures and driveways on the site before or within four days
of submitting this application. I understand that the intent of the Site Plan Review process is to address the impacts of
location and type of structures, and that modifications may be required. Site work will not be done prior to issuance of a
permit.
Signature
Print Name
Date
Signature
Print Name
Date
4
Form: SPR/02 • Rev. 05.27.16 • g:/publications/spr/SPR02SitePlanReviewChecklist.pdf