11.
APPLICABLE FEE (AS PER FEE MATRIX)
1.
COPY OF MOBILIZATION PERMIT (LATEST) OR ALL DOCUMENTS MENTIONED IN THE MOBILIZATION
SECTION (IF APPLICABLE)
2.
PILING DESIGN REVIEW CHECKLIST (REFER FORM NO.: ZA-DC-F-80)
3.
APPROVED SOIL REPORT BY CREATIVE CLUSTERS AUTHORITY (SOFT COPY)
4.
COPY OF SPECIALIZED CONTRACTOR’S LICENSE REGISTERED IN DUBAI
PILING
5.
COPY OF VALID PRELIMINARY DESIGN APPROVAL LETTER
6.
DETAILED DESIGN CALCULATIONS & DRAWINGS WITH CONSULTANT & CONTRACTOR LOGO ON DRAWING
(SOFT COPY AS PER CIRCULAR NO 229)
7.
PEER REVIEW REPORT (AS PER STRUCTURAL GUIDELINES)(SOFT COPY)
8.
APPLICABLE FEE (AS PER FEE MATRIX)
DOCUMENTS REQUIRED – INTERIM BUILDING PERMIT
1. COPY OF MOBILIZATION PERMIT (LATEST) OR ALL DOCUMENTS MENTIONED IN THE MOBILIZATION
SECTION (IF APPLICABLE)
FOUNDATION,SUB-
2. COPY OF VALID FINAL DESIGN (FOUNDATION, SUBSTRUCTURE & PODIUM) APPROVAL LETTER
STRUCTURE,PODIUM
3. SECURITY CHEQUE FROM CONTRACTOR (AS PER FEE MATRIX) OR PERFORMANCE GUARANTEE (REFER
TO TEMPLATE FORM NO. ZA-DC-T- 64) (IF NOT SUBMITTED PREVIOUSLY)
4. APPLICABLE FEE (AS PER FEE MATRIX)
DOCUMENTS REQUIRED – FINAL BUILDING PERMIT
1. ORIGINAL BUILDING PERMIT (LATEST) OR THE DOCUMENTS MENTIONED IN MOBILIZATION
SECTION (IF APPLICABLE)
FINAL BUILDING
2. COPY OF FINAL DESIGN APPROVAL LETTER
PERMIT
3. UNDERTAKING LETTER BY THE CONSULTANT ALONG WITH HSE PLAN (REFER FORM NO ZADC-T-106)
4. NOC FROM MASTER DEVELOPER ON THE ADDITIONAL GFA(FORM NO: ZADC 96) (IF APPLICABLE)
5. SECURITY CHEQUE (IF NOT SUBMITTED PREVIOUSLY)
6. APPLICABLE FEE (AS PER FEE MATRIX)
DOCUMENTS REQUIRED [RE-ISSUANCE, MODIFICATION & RENEWAL OF BUILDING PERMIT]
1.
COPY OF BUILDING PERMIT
RE-ISSUANCE, &
2.
PROJECT DETAILS SHEET (STAMPED & SIGNED BY THE CONSULTANT) (FOR RENEWAL ONLY)
RENEWAL
3.
APPLICABLE FEE (AS PER FEE MATRIX)
REQUESTOR DETAILS
NAME
SIGNATURE
TEL
FAX
DATE
MOBILE
STAMP
EMAIL