Application For Partial Tax Exemption - City Of Richmond Page 2

ADVERTISEMENT

Provide a full description of exterior rehabilitation work to be done:
(Attach narrative if necessary)
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
Provide a full description of interior rehabilitation work to be done
)
: (Attached narrative if necessary
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
______________________________________________________________________________________________
Program Guidelines
By initial, the applicant acknowledges the following guidelines:
Initial:
1. At least one active building permit must exist before the initial application is approved.
_______
2. This application fee is non- refundable after the application has been processed.
_______
3. An inspection must be made by a city appraiser prior to beginning rehab work.
_______
4. Qualifying work must be completed no later than 24 months from date of application.
_______
5. Rehab projects under construction will be partially assessed each January until final.
_______
6. A tax parcel may have only one approved application or credit at any given time.
_______
7. Qualifying additions must be an integral part of the original structure.
_______
8. City ordinance does not provide for any extension(s) of application time.
_______
9. The Early Release Form must be received/signed by the City Assessor prior to
January 1 if the owner wishes to advance start the rehab credit.
_______
st
10.
After Final Value qualification, the credit begins on the next January 1
land book.
_______
11. If any exterior rehabilitation on structures located within a designated historic district,
registered as a Virginia Landmark, or deemed contributing to either, violates standards
set by the Commission of Architectural Review, the rehab application will be voided.
_______
900 E. Broad Street, Room 802 Richmond, VA 23219 Ph: 804.646.7500 Fax: 804.646.5686
Email:
Page 2/4

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Financial
Go
Page of 3