Npdes/sds Stormwater Permit Program For Construction Activity Page 3

ADVERTISEMENT

NPDES/SDS General Stormwater Permit for Construction Activity Violation Citations
Citation
Permit section or rule
No permit
Minn. R. 70090.2010
Subparts 1, 2, 3 (permit required,
permit application deadline, and
compliance requirements for un
permitted construction, respectively)
Change of Coverage
II. B. 5
Line 1
Erosion Control Practices during Construction
a) All exposed soil must be stabilized no later than 14 days
after the construction activity in that portion of the site
has temporarily or permanently ceased
IV. B. 2
b) Normal wetted perimeter of drainage system - 200’
within 24 hours of connecting
IV. B. 3
c) Energy dissipation (temp. or perm.) within 24 hours
IV. B. 4
Line2
Sediment Control Practices during Construction
a) Lacking sediment control practices, Overloaded systems eliminated, no
unbroken slopes 75’ @ 3:1>
IV. C. 1
b) Temporary sediment basin required
III. B
c) Inlet BMPs not functional
IV. C. 4
d) Perimeter controls/soil disturbance
IV. C. 2
Line 3
Inspections and Maintenance
a) Maintenance of erosion and sediment temporary/permanent cover
IV. E. 4
b) Temporary sediment basin 1⁄2-volume
IV. E. 4. b
c) Recovery of sediment in waters (name water body)
IV. E.4. c
- Duty to notify, avoid and recover water pollution
Minn. Stat.115.061§
- Nuisance conditions prohibited (define discharge)
Minn. R 7050.0210, subp.2
d) Vehicle tracking
IV. E.4. d
Line 4
Inspections and Records Retention
III. D
a) SWPPP development required
III. A
SWPPP requirements:
III. A. 4
BMPs/locations procedures
III. A. 4. a
Site map/flow arrows
III. A. 4. b
Areas not to be disturbed
III. A. 4. c
Phased areas
III. A. 4. d
Surface waters/wetlands 1 mile
III. A. 4. e
Methods for final stabilization
III. A. 4. f
Amend SWPPP modify BMP
III. A. 4
b) Inspections (specifically note failed maintenance)
IV. E.
c) Training requirement documentation
III.A.2
Line 5
Permanent Stormwater Treatment
>1 acre impervious, permanent treatment required
III. C
a) Wet sedimentation basin
III. C. 1
Regional ponds
III. C. 3
Infiltration/filtration (hydro analysis)
III. C. 2
Alternative methods, 90-day review, monitoring
III. C. 5
b) Pretreatment required
III. C
c) Dewatering
IV. D
d) Turbid discharges off site or waters of the state
Minn. R 7050. 0210, subp.2
e) Wetland impacts: authorization and mitigation
Line 6
Management Pollution Prevention
a) Solid waste disposed of properly
IV. F. 1
b) Hazardous materials in secondary containment and restricted access
IV. F. 2
c) Defined areas for construction vehicles external washing
IV. F. 3
d) Defined concrete washout on site and with a sign
IV. F. 4
National Pollutant Discharge Elimination System (NPDES) / State Discharge System (SDS) Construction Stormwater Program
wq-strm2-75 (8-08)
MPCA (800) 657-3864