c. The Plan filed by the Gas Company shall include geodetic information for a
particular location:
i.
where circumstances are complex, in order to facilitate known projects,
including projects which are reasonably anticipated by the Engineer/Road
Superintendent, or
ii.
when requested, where the Corporation has geodetic information for its
own services and all others at the same location.
d. The Engineer/Road Superintendent may require sections of the gas system to be
laid at greater depth than required by the latest CSA standard for gas pipeline
systems to facilitate known projects or to correct known highway deficiencies.
e. Prior to the commencement of work on the gas system, the Engineer/Road
Superintendent must approve the location of the work as shown on the Plan filed
by the Gas Company, the timing of the work and any terms and conditions
relating to the installation of the work.
f. In addition to the requirements of this Agreement, if the Gas Company proposes
to affix any part of the gas system to a bridge, viaduct or other structure, if the
Engineer/Road Superintendent approves this proposal, he may require the Gas
Company to comply with special conditions or to enter into a separate agreement
as a condition of the approval of this part of the construction of the gas system.
g. Where the gas system may affect a municipal drain, the Gas Company shall also
file a copy of the Plan with the Corporation's Drainage Superintendent for
purposes of the Drainage Act, or such other person designated by the Corporation
as responsible for the drain.
h. The Gas Company shall not deviate from the approved location for any part of the
gas system unless the prior approval of the Engineer/Road Superintendent to do
so is received.
i. The Engineer/Road Superintendent's approval, where required throughout this
Paragraph, shall not be unreasonably withheld.
j. The approval of the Engineer/Road Superintendent is not a representation or
warranty as to the state of repair of the highway or the suitability of the highway
for the gas system.
6. As Built Drawings.
The Gas Company shall, within six months of completing the installation of any part of
the gas system, provide two copies of "as built" drawings to the Engineer/Road
Superintendent. These drawings must be sufficient to accurately establish the location,
depth (measurement between the top of the gas system and the ground surface at the time
of installation) and distance of the gas system. The "as built" drawings shall be of the
same quality as the Plan and, if the approved pre-construction plan included elevations
that were geodetically referenced, the "as built" drawings shall similarly include
elevations that are geodetically referenced. Upon the request of the Engineer/Road