Letter Of No Objection Or Letter Of Verification Application Form Page 2

Download a blank fillable Letter Of No Objection Or Letter Of Verification Application Form in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Letter Of No Objection Or Letter Of Verification Application Form with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

LETTER OF NO OBJECTION (LNO) OR LETTER OF VERIFICATION (LOV)
CHECKLIST
Prior to January 1, 1938 the Department of Buildings (DOB) did not typically require a Certificate of Occupancy (CO).
A Letter of No Objection (LNO) may be issued if no CO is available, or if the building (or part of the building) has a
different use than that listed on the CO or noted in the available records. A LNO may be issued if the proposed/actual use
belongs to the same Use Group (UG) as defined by the Zoning Resolution and the same Occupancy Group (OG) as
defined by the 2008 Building Code (BC 2008) and the occupancy load and egress is substantially unchanged. A LNO
cannot be issued for a change of UG and/or OG per (AC 28-118.3.4) which requires the filing of an Alteration Type 1
(ALT-1) application and a new CO. (Note: A limited exception exists per Building Bulletin 2009-025). If a CO is
available and requires verification a Letter of Verification (LOV) may be issued.
Some LNO/ LOV requests may be denied until the sign-off of related applications are provided. No LNO/ LOV may be
issued if:
An open ALT-1application (which generates a new CO) is on record or;
There are any open applications related to issues of “life & safety”, Hazardous or Work Without a Permit
Violations.
When filing an LNO/ LOV request please provide the following information (depending on the status of your building):
1. BUILDINGS WITH A CERTIFICATE OF OCCUPANCY:
A copy of the latest Certificate of Occupancy
Copy of Property Profile and a list of Job filings
2. BUILDINGS WITHOUT A CERTIFICATE OF OCCUPANCY:
(Including all Residential buildings and all other buildings with Commercial, Community Facility, Manufacturing or
Mixed use):
Copy of Property Profile and a list of Job filings
Block & Lot Folder Plans/Microfilm (Records Clerk to check & initial if “Available” or
“Not Available”)
Available or Not Available
ADDITIONALLY to above, for Three families and more Dwellings (multiple dwellings) residential or mixed
use buildings please provide:
Department of Housing, Preservation and Development (HPD) printout for the number of
units, the MDR number and any available “I” cards (check HPD WEB Site &/or HPD
Office)
3. BUILDINGS WITH CHILD RELATED SPECIAL OCCUPANCY:
(Including but not limited to: Group Family Day Care Home, Family Day Care Home, Day Care Center,
School, After School Program, Day Camp & Summer Camp)
A copy of the latest Certificate of Occupancy if available
Copy of Property Profile and Job filings
Block & Lot Folder Plans/Microfilm (Records Clerk to check & initial if “Available” or
“Not Available”)
Available or Not Available
Hours and/ or dates of operation, number of children per each age group (under and over 2
years old)
Layout drawing with floor location, exits, accessory spaces, etc.
Fees: $25.00 for 1, 2, 3 family residential buildings
$100.00 for 4 Family or more Residential buildings and all Other buildings
In the case that there are no DOB or other acceptable records or if the available information is insufficient to prove the
legality of the existing use, the applicant might be required to provide additional documentation, e.g. Department of
Finance (DOF) records, Sanborn land-book pages from prior years, City archive records, etc. In the case that the existing
use is a non-conforming use the applicant might be required to provide additional documentation to prove that it was not
discontinued for more than 2 years, e.g. leases, utility bills, etc. In some cases a DOB Field Inspection may be needed to
confirm present conditions for all child related special occupancy LNO/ LOV requests. Such inspections should be
scheduled as soon as possible after payment of the processing fee.
|
build safe
live safe
Revised - 5/19/14

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Letters
Go
Page of 2