Stormwater Management Plan Completeness Checklist Form Page 2

Download a blank fillable Stormwater Management Plan Completeness Checklist Form in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Stormwater Management Plan Completeness Checklist Form with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

Sheet
 Description
Line
Code Reference
Yes
N/A
No.
 General description of the surface waters / outfalls into which the
15
§124-2-7.B.4
SWM facilities will discharge
§124-2-7.B.4
 Mechanism through which the facilities will be operated and
16
PFM
maintained after construction
§6-0402.8G
17
Stormwater information on cover sheet filled in
§124-2-7.B.5
Description
Sheet
Line
Code Reference
Yes
N/A
Hydraulic and Hydrologic Computations to include:
No.
 Pre and post development runoff computations
18
§124-2-7.B.6
 Inlet computations
19
PFM §6-0905
 Storm drain computations
20
PFM §6-1110
 Open channel computations
21
PFM §6-1008
Description
Sheet
Line
Stormwater Quality and Quantity Compliance Computations
Code Reference
Yes
N/A
No.
(§124-2-7.B.7)
SWMO Article 4
or Article 5 as
 Water Quality computations
22
applicable
PFM 6-0402.8
SWMO Article 4
 Channel protection computations
23
or Article 5 as
applicable
SWMO Article 4
 Flood protection computations
24
or Article 5 as
applicable
 Detention computations
25
§124-4-4.D
Description
Sheet
Line
Code Reference
Map of the site showing the following: (§124-2-7.B.8)
No.
Yes
N/A
 All contributing drainage areas shown
26
§124-2-7.B.8.a
 Existing streams, ponds, culverts, ditches, wetlands, water bodies,
27
§124-2-7.B.8.b
RPAs and floodplains
 Soil types and vegetative cover
28
§124-2-7.B.8.c
 Existing land use, existing structures and roads, utilities & easement
29
§124-2-7.B.8.d
locations
 Sufficient offsite topography to assess the impacts of stormwater
30
discharges from the site on these parcels, including impacts to
§124-2-7.B.8.e
downstream structures
§124-2-7.B.8.f
 Limits of clearing and grading
31
PFM §2-203.1C
 Proposed on-site drainage patterns
32
§124-2-7.B.8.f
 Proposed buildings, roads, parking areas, utilities, and stormwater
33
§124-2-7.B.8.g
management facilities
 Proposed land use with a tabulation of the percentage of surface
34
§124-2-7.B.8.h
area to be adapted to various uses, including but not limited to
planned location of utilities, roads, and easements.
Offsite compliance options utilized? (N/A if BMPs are met onsite).
35
Letter of availability from offsite provider when offsite BMPs are used
§124-2-7.B.9
for water quality compliance
Comments:
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
Note: This checklist must be signed and sealed by the licensed professional
preparing the plan and submitted with the plan. Each checklist item must be
adequately addressed in the plan for the plan to be deemed complete and
acceptable for review.
Professional Sign and Seal:
SDID 7/22/14
2

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal
Go
Page of 2