Sheet
Description
Line
Code Reference
Yes
N/A
No.
General description of the surface waters / outfalls into which the
15
§124-2-7.B.4
SWM facilities will discharge
§124-2-7.B.4
Mechanism through which the facilities will be operated and
16
PFM
maintained after construction
§6-0402.8G
17
Stormwater information on cover sheet filled in
§124-2-7.B.5
Description
Sheet
Line
Code Reference
Yes
N/A
Hydraulic and Hydrologic Computations to include:
No.
Pre and post development runoff computations
18
§124-2-7.B.6
Inlet computations
19
PFM §6-0905
Storm drain computations
20
PFM §6-1110
Open channel computations
21
PFM §6-1008
Description
Sheet
Line
Stormwater Quality and Quantity Compliance Computations
Code Reference
Yes
N/A
No.
(§124-2-7.B.7)
SWMO Article 4
or Article 5 as
Water Quality computations
22
applicable
PFM 6-0402.8
SWMO Article 4
Channel protection computations
23
or Article 5 as
applicable
SWMO Article 4
Flood protection computations
24
or Article 5 as
applicable
Detention computations
25
§124-4-4.D
Description
Sheet
Line
Code Reference
Map of the site showing the following: (§124-2-7.B.8)
No.
Yes
N/A
All contributing drainage areas shown
26
§124-2-7.B.8.a
Existing streams, ponds, culverts, ditches, wetlands, water bodies,
27
§124-2-7.B.8.b
RPAs and floodplains
Soil types and vegetative cover
28
§124-2-7.B.8.c
Existing land use, existing structures and roads, utilities & easement
29
§124-2-7.B.8.d
locations
Sufficient offsite topography to assess the impacts of stormwater
30
discharges from the site on these parcels, including impacts to
§124-2-7.B.8.e
downstream structures
§124-2-7.B.8.f
Limits of clearing and grading
31
PFM §2-203.1C
Proposed on-site drainage patterns
32
§124-2-7.B.8.f
Proposed buildings, roads, parking areas, utilities, and stormwater
33
§124-2-7.B.8.g
management facilities
Proposed land use with a tabulation of the percentage of surface
34
§124-2-7.B.8.h
area to be adapted to various uses, including but not limited to
planned location of utilities, roads, and easements.
Offsite compliance options utilized? (N/A if BMPs are met onsite).
35
Letter of availability from offsite provider when offsite BMPs are used
§124-2-7.B.9
for water quality compliance
Comments:
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
_____________________________________________________________________________________________________
Note: This checklist must be signed and sealed by the licensed professional
preparing the plan and submitted with the plan. Each checklist item must be
adequately addressed in the plan for the plan to be deemed complete and
acceptable for review.
Professional Sign and Seal:
SDID 7/22/14
2