Letter Of Assurance Schedule A (Part A And B) Form - Office Of The Fire Commissioner Page 4

ADVERTISEMENT

GEOTECHNICAL -------- Permanent
8.1
Bearing capacity of the soil
8.2
Geotechnical aspect of deep foundations
8.3
Compaction of engineered fill
8.4
Structural considerations of soil, including slope stability
8.5
Backfill
8.6
Permanent dewatering
8.7
Permanent underpinning
MANITOBA ENERGY CODE FOR BUILDINGS (MECB)
9.1
Part 1 and Part 8: Acceptable Solutions and Building Energy Compliance Path
9.2
Part 3: Building Envelope
9.3
Part 4: Lighting
9.4
Part 5: HVAC Systems
9.5
Part 6: Service Water Heating Systems
9.6
Part 7: Electrical Power Systems and Motors
Affix with Seal and Signature
_______________________________
Date
Coordinating Registered Professional:
_______________________________
Name
_______________________________
Signature
4

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal
Go
Page of 4