APPLICATION FOR MECHANICAL PERMIT
CITY OF ZION-BUILDING DEPARTMENT
(847) 746-4018
JOB LOCATION: Number and Street: __________________________________________________
LEGAL DESCRIPTION: Lot ____________ Block ____________________ Section ____________ Township
46 North, Range 12 East of the Third Principal Meridian, Lake County, Illinois
PROPERTY OWNER: ______________________________________________PHONE: ( _____ )_____________________________
ADDRESS _____________________________________CITY _______________________ STATE________ZIP___________
GENERAL CONTRACTOR: ________________________________________PHONE: ( _____ )_____________________________
ADDRESS _____________________________________CITY _______________________ STATE________ZIP___________
MECHANICAL CONTRACTOR:_____________________________________PHONE: ( ____ _)_____________________________
ADDRESS _____________________________________CITY _______________________ STATE________ZIP___________
MECHANICAL LICENSE NO._________________WITH THE CITY/VILLAGE:_____________________________________
SQUARE FOOTAGE OF AREA:__________________
(HEAT/AIR CONDITIONED)
FURNACE: Mechanical room: _______ Basement _______Other ________________
Type: ___________ Fuel: ____________ BTU input/output _________/_________
Class "B" flue size: _______ Is outside air required? Yes ____ No ____
Combustion air source _____________ Amount of combustion air required _________
AIR CONDITIONING: New:________
Replacement:__________
Size: __________Condenser location: ________Heat pump __________ Seer:________
EXISTING BUILDING (check all that apply): existing vent type ____________
Repair _______
Retro - fit _______
Flue liner _______
Furnace _______
AC _______
FIREPLACE:
Wood burner _______Gas (log/starter) _______Class "A" flue size_______
Masonry _______ Metal _______
Manufactured _______ Insert _______
ESTIMATED VALUE OF MECHANICAL WORK: $_____________________
If no work is performed hereunder within six months from the date a permit is issued or if the work is not completed within one year from the date a
permit is issued, the mechanical permit shall expire by limitation as provided by City code. The undersigned applicant agrees to comply with all
provisions of the mechanical ordinance of the City of Zion and with the provisions of all other law relating to the erection, repair, and alteration of
buildings in effect at the date of the permit issued hereunder. The said applicant herewith agrees not to make any changes in the plans or specifications,
as approved, without first obtaining further approval for such changes from the building inspector.
I hereby certify that I have read the mechanical section of the Municipal Code and know the
contents thereof.
_______________________________________________
________________
Signature of Mechanical Contractor
Date
(for office use only)
PERMIT N0. ME-16-______________
DATE PERMIT ISSUED: _____________________
PERMIT FEE: $_______________