Work Notice Form Page 2

ADVERTISEMENT

excavation in the street, and another at the shut-off valve. This work will interrupt your water supply for
about 4 hours, so we will notify you shortly before it happens so you can plan your water usage accordingly.
Because the portion of the lead service line you own can continue to affect water quality, and in fact,
partial replacement may actually temporarily increase lead levels, we urge you to replace your portion
at the same time. If you say YES below, we will authorize our contractor to replace your portion of the line
at the same time they are replacing the CITY/TOWN’s portion. We will provide you an estimate, and bill
you after the work is done. Most replacements cost between $XX and $XX.
Please fill out the bottom portion of this notice indicating your decision on replacing the portion of the lead
service line that you own, sign your name, date and return this form to us in the attached pre-stamped
envelope.
If you decide not to replace the portion of lead service line that you own, please be advised that potentially
the lead level coming out from your faucet may be elevated for a short time. Therefore, please make sure
that you use only fresh water from the main for drinking and cooking by flushing until the water after it is
cold, typically about 1-10 minutes depending on the length of the service line and internal plumbing. The
enclosed brochure contains additional information on the potential health risks of lead, and simple steps you
can take to reduce your exposure.
If you do not have your portion of the lead service replaced, we will need to enter your home within 3 days
of our work to obtain a water sample to test for lead levels. The result will be sent to you within 3 days of
our receiving the results.
Please contact us at __________if you have any questions. Thank you very much.
NAME
Town Manager/DPW Superintendent
________________________________________________________________________
RESPONSE FROM HOMEOWNER:
I have read this notice and agree:
• YES____I want to replace my portion of the lead service line for the estimated amount of
$__________.
• NO_____. I do not want to replace my portion of the lead service line, and I have read and
understand that lead levels may temporarily increase after the town removes the portion in the street.
Name:________________________________________Date______________________

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal
Go
Page of 2