Supplier Quality System Survey Page 5

ADVERTISEMENT

SECTION SCORING CRITERIA
0 Nothing is in place or planned or N/A
1 Planned but not yet documented or
SUPPLIER QUALITY SYSTEM SURVEY
implemented
2 Developed, documented but not fully
implemented
3 Fully documented and implemented.
QUESTION
DESCRIPTION
SCORE
COMMENTS
STATISTICAL QUALITY CONTROL
9
Do procedures include sampling inspection?
9.1
Do the above procedures allow for customer approval of the sampling plan?
9.2
Are statistical methods that provide effective control of quality in use where appropriate?
9.3
HANDLING AND STORAGE
10
Is there a procedure for the proper handling, traceability and storage of materials, parts and
10.1
assemblies?
Is there a procedure for the control, identification and storage of limited life material?
10.2
Are items in storage identified to indicate inspection status?
10.3
Is there an established process for prevention of Foreign Object Damage (FOD)?
10.4
PROCESS CONTROL
11
Is there documentation which identifies production, installation and servicing operations (shop
11.1
orders, travelers, work, instructions, etc.)?
Are process specifications/procedures used which define complex operations such as:
11.2
assembly, welding, X-ray, plating, cleaning and testing?
Is there a procedure which specifies adequate workmanship requirements, cleanliness and
11.3
handling practices for all areas?
Is there objective evidence of quality personnel’s review/approval of the above documentation?
11.4
12
SPECIAL PROCESSES
Is a system and records maintained which reflects certification of personnel performing special
12.1
processes?
12.2
Does supplier use customer approved processors/personnel when required by contract?
12.3
Are applicable tests performed to verify process controls and quality of items processed?
Are process controls and monitoring provided where quality cannot be assured by inspection
12.4
alone?
12.5
Is a system and records maintained which reflects validation/certification of Special Processes?
13
IN PROCESS AND END ITEM INSPECTION AND TESTING
13.1
Are inspection/test instructions preplanned and issued on a controlled basis?
Is there a system for providing and controlling inspection acceptance/rejection criteria to all
13.2
inspection functions?
Form QA001 Rev C 2/24/10
Supplier Quality System Evaluation Report
5 of 8

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 8