Training Checklist Template

ADVERTISEMENT

Training Checklist
Company Phone:
Company:
Email address:
Company Address:
City:
State:
Zip:
Trainee:
Date:
The Crossville Laminam Installation Manual is required to complete this form. Read, discuss and review all sections
before allowing installer to check off the line boxes and initial the completion box.
1. The Product
Complete ( )
Complete ( )
8. Equipment
Tech guide sec. 5.3
( ) Sure grip gloves
Fabrication procedures or techniques not contained within
( ) Safety Glasses
the Crossville Laminam technical guide will not be
( ) Dust masks
recognized
as
approved
methods
of
installation.
( ) 2 person crew
Deviations from these techniques must be approved.
( ) Rail cutter w/ small scoring wheel
( ) Sander w/ pad
2. Packing and Packages
Complete ( )
Tech guide sec. 1&2
( ) Trowels
( ) Crates - packaging specifications
( ) Handling frame w/ suction cups
( ) Daimond tipped core bits
Complete (
)
3. Handling
Tech guide sec. 3
( ) Diamond sanding pads
( ) Palletized package handling by fork lifts
( ) Angle Grinder-with glass blade (Vetro by Alpha or similar)
- 84" extended forks from ends, 44" from side
( ) Profiling tool-Kera Edge or profiling wheels
( ) Manual handling and storage
Complete ( )
9. Install
3+ Walls/5.6 Floors Tech guide sec. 4.8 & 5
Complete (
)
4. Current Applications
Tech guide sec. 4.1 - 4.3
( ) Qualified Labor
( ) Interior Walls
( ) Interior Floors
( ) Countertops
( ) Cutting & drilling
( ) Exterior Walls
( ) Mortar Application
( ) Application of the tile to the substrate
5. Suitable Substrates
Complete (
)
Tech guide sec. 4.4 & 4.5
( ) Lippage control devices-removable cap
3+ Walls
5.6 Floors
( ) Grouting techniques
( ) Existing Ceramic
( ) Slab on grade and above grade
Complete ( )
10. Cleaning & Maintenance
Tech guide sec. 6
( ) Tile over tile,slab on grade and
( ) Tile Backer Boards
above grade
( ) Concrete/CMU Walls
( ) Cleaning after application
( ) Surface Textures
( ) Gypsum/Dry wall
( ) Routine cleaning
( ) Exterior Walls in both thicknesses per TCNA Handbook and
Complete ( )
11. Setting Materials
Tech Guide sec. 7
Crossville's exterior guidelines on website
( )
Complete (
)
6. Substrate Preparation
Tech guide sec. 4.6
12. Safety
Complete ( )
3+ Walls & 5.6 Floors
( ) <1/8 inch in 10 ft. and <1/16 inch in 2ft.
( ) Crates - Metal collars and removal of side board
( ) Gloves, dust masks & safety glasses
Complete (
)
7. Profiles & Movement Joints
( ) Profiles
Tech guide sec. 4.7 & 5.10
( ) Movements joints and edge protection
Installer
Date
Instructor
Date

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Life
Go