Stormwater Pollution Prevention Program (Swppp) Template Page 10

ADVERTISEMENT

1.6 r
W
eceIvIng
aTerS
Instructions:
• List the waterbody(s) that would receive stormwater from your site, including streams, rivers, lakes, coastal
waters, and wetlands. Describe each as clearly as possible, such as Mill Creek, a tributary to the Potomac
River, and so on.
• Indicate the location of all waters, including wetlands, on the site map.
• Note any stream crossings, if applicable.
• List the storm sewer system or drainage system that stormwater from your site could discharge to and the
waterbody(s) that it ultimately discharges to.
• If any of the waterbodies above are impaired and/or subject to Total Maximum Daily Loads (TMDLs),
please list the pollutants causing the impairment and any specific requirements in the TMDL(s) that are ap-
plicable to construction sites. Your SWPPP should specifically include measures to prevent the discharge
of these pollutants.
Name of Watershed: _________________________________________________________________________
Receiving Waterbody: ______________________________________________________ Class ____________
Distance from project outfall to receiving water: __________ feet
Type of outfall: ______________________
How will velocity be reduced at the outfall? ______________________________________________________
N
: If outfall discharges to more than one receiving water body, attach information for each outfall. If dis-
ote
charge is to a sinkhole, list groundwater as the receiving water and submit a Sinkhole Evaluation report.
Description of storm sewer/drainage system: ______________________________________________________
__________________________________________________________________________________________
Will work be done in a Jurisdictional stream or creek?
Yes
No
If so, what steps will be taken to address the impact of construction? _____________________________
____________________________________________________________________________________
____________________________________________________________________________________
N
: A Limited Stream Assessment must be submitted if work is done in the stream buffer.
ote
N
: Include a copy of the 404/401 Permit or Nationwide Permit
ote
Are there any impaired waters on the site?
Yes
No
If so, what is the name of the waterbody and list the impairment: ________________________________
___________________________________________________________________________________
N
: For a list of impaired waters, please visit
ote
If the above answer is yes, has a Total Maximum Daily Load (TMDL) been developed?
Yes
No
If a TMDL has been developed, list any specific reqirements that are applicable to the construction site.
____________________________________________________________________________________
____________________________________________________________________________________
____________________________________________________________________________________
10

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business