Stormwater Pollution Prevention Program (Swppp) Template Page 11

ADVERTISEMENT

1.7 S
f
S
a
P
ITe
eaTureS and
enSITIve
reaS To be
roTecTed
Instructions:
• Describe unique site features including streams, stream buffers, wetlands, specimen trees, natural vegeta-
tion, steep slopes, or highly erodible soils that are to be preserved.
• Describe measures to protect these features.
• Include these features and areas on your site maps.
• N
: If you have any environmentally sensitive areas on your site pertaining to wetlands, caves, or sink-
ote
holes, please keep the following in mind. These requirements can be found in Section 4.7 of the proposed
Boone County Stormwater Ordinance.
Environmentally sensitive areas on or near the project?
Yes
No
If yes, describe of environmentally sensitive area: __________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
Steps taken to address the impact of construction: __________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
S
B
m
- if there will be construction taking place along a stream and this project
tream
uffer
eaSurementS
has been platted after June 1, 2009, please fill this section out:
Will there be any stream buffer delineations on site?
Yes
No
Width:
Slope Modifications (% slope):
Type 1 (not to disturb within 100 ft.)
0-14% (no change in outer zone width)
Type 2 (not to disturb within 50 ft.)
15-25% (add 25 ft. to outer zone width)
Type 3 (not to disturb within 30 ft.)
>25% (add 50 ft. to outer zone width)
Will there be any stream buffer averaging taking place on this property?
Yes
No
• The average width of the stream buffer must meet the minimum requirement specified in both the width
and slope requirements above.
• There is no reduction in the width of the Streamside Zone.
• No new structures are to be built in the 100-year flood plain.
• For Outstanding Resource Waters/Losing Streams, the buffer zone shall be twice that of the regulatory
stream buffer.
11

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business