Stormwater Pollution Prevention Program (Swppp) Template Page 8

ADVERTISEMENT

Consulting Company: ________________________________________________________________________
Consultant’s Name: __________________________________________________________________________
Address: __________________________________________________________________________________
City: _____________________________________________ State: _____________
Zip: _____________
Phone: ____________________________________ Fax: _________________________________________
Email: ____________________________________________________________________________________
1.3 c
S
e
onSTrucTIon
ITe
STImaTeS
Instructions:
• Estimate the area to be disturbed by excavation, grading, or other construction activities, including dedi-
cated off-site borrow and fill areas.
• Calculate the percentage of impervious surface area before and after construction
• Calculate the runoff coefficients before and after construction.
Total Site Area _____________ acres
Estimated Area to be disturbed by all activities: ______________ acres
Percentage impervious surface prior to development: ________________%
Runoff Coefficient prior to development: ________________________________________________________
Percentage impervious surface after development: ________________ %
Runoff Coefficient after development: __________________________________________________________
1.4 n
S
c
a
aTure and
equence of
onSTrucTIon
cTIvITIeS
Instructions:
• Briefly describe the nature of the construction activity and approximate time frames (one or more para-
graphs, depending on the complexity of the project).
General Description of Project (N
: attach an 8.5” x 11” location map with enough detail to identify the loca-
ote
tion of the construction site, direction of stormwater flow, receiving waters within one (1) mile of the site, loca-
tions of off-site material, waste, borrow, and equipment strage areas, surface waters and wetlands, stormwater
discharge locations, and map section, township, and range as required by MDNR).
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
__________________________________________________________________________________________
8

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business