ODOT ARTS Systemic Application Form
Form Date: 3/27/15
Part 4: Application Attachments
(See application
Instructions)
Check all attachments included in this application.
Attachment Item
Requirement?
Cost Estimator Worksheet
Required
✔
Benefit/Cost Analysis or Cost-Effectiveness Index Worksheet(s)
Required
✔
Aerial Vicinity Map / Location Map
Required
✔
Ground View Pictures of Existing Conditions
Required
✔
Crash Report(s)
Required
✔
Required (where
Warrant Studies
applicable)
Project Sketch Showing Existing and Proposed Conditions
Recommended
Collision Diagram(s)
Optional
Additional Narration, Documentation, Letters of Support, etc.
Optional
Agency Name: ODOT
Page 8 of 9