Sale And Purchase Agreement Page 21

ADVERTISEMENT

THE SCHEDULE – continued
FORM E
THE SCHEDULE
SPECIFICATIONS OF THE BUILDING
1.
Foundation
State the type of foundation and material used (e.g. bore piles, precast
concrete piles, steel H-piles, tanalised timber piles or bakau piles).
2.
Superstructure
State the type of materials used (e.g. reinforced concrete using Grade 30
concrete manufactured from Portland Cement complying with SS26 steel
reinforcement bar complying with SS22).
3.
Walls
(a)
External Wall – state the material used.
(b)
Internal Wall – state the material used.
4.
Roof
(a)
Pitched roof :
(i)
state the roof covering material used;
(ii)
state the type of insulation where provided;
(iii)
state the type of roof truss construction and the treatment
provided; or
(b)
Flat roof :
State the concrete roof with appropriate water proofing and insulation
where provided.
5.
Ceiling
State the type and material of ceiling to be provided and location.
6.
Finishes
(a)
Wall :
(i)
state the type and extent of internal finishes (e.g. full height
ceramic wall tiles for kitchen and bathrooms);

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business