Voluntary - 43 Cfr 3809 Plan Of Operations Form - United States Department Of The Interior Page 22

Download a blank fillable Voluntary - 43 Cfr 3809 Plan Of Operations Form - United States Department Of The Interior in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Voluntary - 43 Cfr 3809 Plan Of Operations Form - United States Department Of The Interior with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

Voluntary – 43 CFR 3809 Plan of Operations Form
EXHIBIT V
Reclamation Plan [Pursuant to 43 CFR 3809.401(b)(3)]
This Exhibit may be applied to CDRMS Hardrock 110 Exhibit D or Hardrock 112 Exhibit E, additional information may be required.
Additional information and/or mitigation may be included in the corresponding NEPA analysis for the proposed project.
1. A plan for reclamation to meet the standards in 43 CFR 3809.420 is required with this application. If multiple
state/federal agencies are involved in the proposed operation, one reclamation plan must be included in your
submittal to the agencies that meets the requirements of both sets of regulations.
The reclamation plan should include, but is not limited to, a description of the equipment and devices, practices you
propose to use, a timeline for completion, etc. Also address wildlife and riparian habitat mitigation (as applicable).
Features and designs outlined below should be incorporated into Exhibit VI.
a. It is suggested that a photographic record of the pre- mining, post-mining, and post-reclamation conditions be
kept by the prospector. These photos should be taken from the same location and by the same method to
clearly show the pre-site conditions of the land and the reclamation efforts. Upon completion of reclamation
and request for bond or surety release, the photos may be considered as evidence of adequate reclamation, and
thus, be able to act more quickly on the request for release.
b. Per 43 CFR 3809.420 you are required to reclaim concurrent with mining as is feasible. Please describe the
general methods, steps, and timing of both interim and final reclamation. Include slopes or gradients to be used
during interim and final stages. Provide the technical criteria used to determine the gradient and stability of
slopes created or affected by the mining operation.
c. Provide a description of the native vegetation of the area to be disturbed, including tree, shrub, and grass
communities of the area. Color photographs, sufficient to adequately represent the ecology of the site and
adequately labeled (including date, orientation and location), may be used to help support a written description.
Page 22 of 36

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal