Voluntary – 43 CFR 3809 Plan of Operations Form
EXHIBIT III
Pre-Mining and Mining Plan Map(s) of Affected Lands
This Exhibit may be applied to CDRMS Hardrock 112 Exhibit C or a portion of Hardrock 110 Exhibit E, additional information may be required.
Please include an accurate topographic base map showing the location of the proposed project with this form. The
prospector may submit a U.S.G.S 7.5 minute quadrangle or similar map of adequate scale.
One or more maps may be necessary to legibly portray the following information:
1. all immediately adjoining surface owners of record112(4)(c);
2. the name and location of all creeks, roads, buildings, oil and gas wells and lines, and power and
communication lines on the area of affected land and within two hundred (200) feet of all boundaries of
such area112(4)(e);
3. the existing topography of the area with contour lines of sufficient detail to portray the direction and rate of
slope of the affected land112(4)(g);
4. the total area to be involved in the operation, including the area to be mined and the area of affected lands
(see definition of "Affected Land")112(4)(f) ;
5. the type of present vegetation covering the affected lands112(4)(i); and in conjunction with Exhibit G -
Water Information, Subsection 6.4.7, if required by the Office, further water resources information will be
presented on a map in this section. 112(3)(c) and 115(409e)
6. Show the owner's name, type of structures, and location of all significant, valuable, and permanent man-
made structures contained on the area of affected land and within two hundred (200) feet of the affected
land.
7. In conjunction with Exhibit I - Soils Information, Subsection 6.4.9, soils information may be presented on a
map in this section;
a. Aerial photos, if available, may be included in this section.
Page 9 of 36