NEW CONSTRUCTION FOR COMMERCIAL BUILDINGS
AND ADDITIONS
(Page 3)
APPLICATION CHECKLIST AND REQUIRED DOCUMENTS (CONTINUED)
15. If the project includes construction of areas where food/ice or beverages are manufactured, packaged, stored,
distributed, sold or prepared excluding vending machines, then provide:
Two (2) sets of scaled floor plans showing equipment and plumbing fixtures layout including floor
drains.
Two (2) sets of scaled plans showing finish schedules for floors, walls and ceilings.
Two (2) sets of menus and cut sheets of equipment being installed, if available.
16. Two (2) sets of civil plans.
Site grading plan
Public infrastructure as applicable:
Domestic water and sanitary sewer
Storm water
Drive approaches and sidewalks
Turn lanes, deceleration lanes and median cuts
All aspects of the construction project complies with the Environmental Protection Agency (EPA) Lead;
17.
Renovation, Repair and Painting Program Rule; 40 CFR, Part 745.
NOTE: Additional information required by the Building Official may be necessary for the issuance of the permit (Ordinance no. 26029).
I,
have read the above information and acknowledge that all required documents have been
provided.
Signature _______________________________________
Date _____________________
SUSTAINABLE DEVELOPMENT AND CONSTRUCTION DEPARTMENT
w BUILDING INSPECTION DIVISION
OAK CLIFF MUNICIPAL CENTER, 320 E. JEFFERSON BLVD., ROOM 118, DALLAS, TX 75203 w TEL. NO. (214) 948-4480
REV 10-01-2015