A. Submittals to regulatory agencies shall be provided in the quantities and formats as specified by the regulatory
agencies. Submit two copies of all such submittals to the Architect. Submit the required number of documents
directly to the regulatory agency.
2.06
MANUFACTURER QUALIFICATION/CERTIFICATION
A. Submit 4 copies of required manufacturer certifications.
2.07
QUALIFICATION/CERTIFICATION
A. Applicator/Installer Qualification/Certification:
1.
Applicator/Installer qualification documentation shall consist of a certificate, letter, or other appropriate
document issued by a product manufacturer or regulatory agency which states that the company or
individual who is applying or installing the product has been trained and is currently certified by the
certificate issuer and that product guarantees/warranties will be honored.
a.
Submit 3 copies of each qualification/certification document.
b.
All such certifications shall have been issued no less than 3 months prior to the bid opening date.
c.
Failure to submit certification data within a designated time period or failure to satisfy minimum
standards shall be grounds for rejection of the candidate contractor or trade contractor under the terms
of the General Conditions for Construction.
d.
Work which is executed without required certification shall be subject to rejection and complete
replacement at the expense of the Contractor. No contract extension shall be granted for rejection of an
unqualified or uncertified contractor.
B. Trade Qualification:
1.
Where identified in other portions of the contract documents, Contractors performing certain portions of the
work shall provide written certification of experience and/or other unique qualifications.
Submit to the Architect 3 copies of a written statement summarizing the contractor’s ability to meet
a.
requirements specified in the relevant specification sections.
b.
Where a listing of completed projects is required, include associated contact names and telephone
numbers.
Where manufacturer’s certifications are required, submit 3 copies of manufacturer’s certification to the
c.
Architect for review and approval. Such certificates shall have been issued a minimum of three months
prior to the bid opening date.
2.
Do not proceed with related work until submitted Qualifications and/or Certifications have been reviewed
and approved by the Architect. Work executed without prior approval of Qualifications and/or
Certifications shall be subject to rejection. No time extensions will be permitted due to the rejection of
proposed trade contractors because of failure to meet Certification or Qualification requirements.
3.
Work executed without approval of required Qualification or Certification submittals will be subject to
rejection at the discretion of Architect.
2.08
TEST REPORTS
A. The results of test reports prepared by the DPS testing consultants or the Contractor or Sub-contractor shall be
forwarded to DPS, Architect & Contractor by the testing company as soon as results are available. All test
reports shall be signed by an officer of the company.
2.09
SUBMITTAL LIST
A. Provide a submittal list for specification divisions 2-14 on the project. Inconsistencies or omissions from the list
do not relieve the contractor from required submittals delineated in each specification section. See example
below:
Denver Public Schools – Facility Management
01 33 00
Submittals
Technical Construction Guidelines
Page 2 of 3
Update: April 2016

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 3