SECTION 03300
1
2
1. MIX DESIGN
- CONCRETE
2. TESTING
AGENCY
NOTIFICATION – 2
DAYS PRIOR TO
POUR
SAMPLE
3
1,2
1. ARCHITECT (3
DAYS)
2.
TESTING (5 DAYS)
3. WELDING
CERTIFICATION
PART 3 - EXECUTION
3.01
SUBMITTAL PROCESSES
A. Identify each submittal with the following information permanently affixed to or noted for each submittal and
noted on the submittal transmittal form: name of the project, DPS Project Number, name, address and telephone
number of subcontractor, supplier, manufacture and any other second tier contractor associated with the
submittal date, General Contractor, submittal name and number, and Specification Section number governing
the submittal. If submittal pertains to more than one spec section, identify each section to which the submittal
pertains.
3.02
CONTRACTOR RESPONSIBILITY
A. Under no circumstances shall reviewed submittals be permitted to be used in conjunction with the work. Work
executed without required review and approval by the Architect/ Engineer shall be subject to rejections.
Removal and reconstruction of this rejected work shall be at the Contractor’s expense.
3.03
SUBMITTAL SCHEDULE:
A. The Contractor shall prepare a schedule of anticipated submittal dates which shall include the date of delivery to
the Architect and the date the submittal is to be returned to the Contractor. The schedule shall be approved by
DPS, Architect, and Contractor. No adjustments for project delays due to rejection of submittals will be
considered.
B. Refer to Section 01 32 00 for detail requirements regarding scheduling. Incorporation of the submittal schedule
into the overall project schedule is required.
3.04
DELIVERY
A. Unless otherwise noted in writing upon submission to the Architect, Submittals shall constitute an implied
statement by the Contractor that submitted items can be fabricated and delivered to the project site without delay
to the project schedule.
END OF SECTION 01 33 00
Denver Public Schools – Facility Management
01 33 00
Submittals
Technical Construction Guidelines
Page 3 of 3
Update: April 2016