Permit Procurement Fees
Contractor-provided services required to seek permits shall be passed-through, and invoiced separately
according to rates, terms and conditions below.
Contractor cost for all municipal fees.
Contractor cost for all materials, supplies, and one-time use tools and materials.
Contractor cost for all subcontracted services.
Contractor cost for all rentals of temporary facilities, machinery, tools, and equipment.
$50.00 per running hour for Contractor-owned heavy equipment and associated implements, with a
minimum rate of 4 hours per use.
Contractor personnel at rates defined below:
Owner/President:
$100.00
Production Coordinator, Project Supervisor:
$ 75.00
Administrative:
$ 60.00
Master Builder:
$ 60.00
Journeyman Builder:
$ 50.00
Apprentice Builder:
$ 40.00
Builder's Assistant:
$ 35.00
Meeting attendance shall have a minimum charge of two hours per meeting.
Contractor shall make every effort to assign appropriately-skilled personnel to any given task, but shall be
solely responsible for personnel assignments. Labor rate shall be based on personnel assigned, regardless of
type of task.
Permit Procurement fees are due for services provided whether or not permits are secured.
PHASE VI:
FINAL PROJECT DEFINITION
I.
Construction Plans
Construction plans are required for permitting and to communicate building details to all involved in the
construction of Project.
Contractor shall work with Owner’s designer in an effort to minimize cost of Construction Plans by advising
designer to limit details to only those required to obtain permits and to direct parties involved in the
construction of Project.
Owner may engage Contractor to adjust Plans or produce construction documents in lieu of completion by
Owner’s designer.
Owner shall compensate Contractor for designer services to create Construction Plans at a rate of
$90.00 per hour.
II.
Selections
Contractor shall provide Owner with Selections Consultant to help Owner expeditiously choose elements within
the Project that maintain continuity of design as desired by the Owner.
Contractor’s Selections Consultant shall provide Owner with professional services for product selections
and material layout specification as needed to fully define Project.
Selections Consultant shall coordinate with Owner and/or vendors as needed to complete Selections.
Unless otherwise dictated, allowances incorporated in final Interim Budget will provide a reference point for
Selections.
Selections not completed prior to execution of Construction Contract shall be represented by an allowance
as part of defined Project.
Contractor shall provide Selections Consultant services for a maximum of
hours. Owner shall
compensate Contractor for Selections Consultant’s time exceeding the maximum allotment at a rate of
$90.00 per hour.
III.
Contract Specifications
Contractor shall coordinate with Designer, Selections Consultant, and Owner as needed to create detailed
Contract Specifications.