APPENDIX 1
PREVENTIVE MAINTENANCE CHECKLIST
EMERGENCY STANDBY GENERATORS/SWITCHES/CONTROLS
Agency Representative: ________________________
_________________________________
(Print Name)
(Signature)
Location
Time:
Date:
: ___________________________
_____________
_____________________
Hour Meter:
_________________________
Unit Mfg. ______________________
Model: ______________
S/N:_
_____________________
Engine Mfg:
Model: ______________
S/N:____________________
______________________
Gen. Mfg. ______________________ Model:_______________
S/N:____________________
SECTION A – COOLING SYSTEM
SAT.
UNSAT.
(check one)
1. Engine coolant level
2. Radiator core/heat exchanger
3. Coolant lines/connections/hoses & connections
4. Water jacket heater(s)
Note: Contractor is responsible for replenishing of necessary fluids where there is an unsatisfactory
rating.
SECTION B – D.C. ELECTRICAL SYSTEM
SAT.
UNSAT.
(check one)
1. Battery(s) electrolyte level/specific gravity
2. Battery compartment/heater cooperation
3. Battery connections/cables/casing
4. Shutdown mechanisms
5. Electrical starter/alternator generator
6. Electrical system, accessories & components
Note: Contractor is responsible for indicator lights, indicator lamps, gauges, switches, relays, contactors,
solenoids, coils, voltage regulators, sensors, fuses, pressure sensing switches, transformers, power
supplies, battery cables and connections.
SECTION C – A.C. ELECTRICAL SYSTEM
SAT.
UNSAT.
(check one)
1. A.C. wiring
2. Battery charger
3. Control panel/switchgear
4. A.C. generator voltage regulator
5. Electrical system accessories & components
Note: Contractor is responsible for the same components listed under Section B-D.C. Electrical System.
1
T1399 7/12/07

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Life
Go
Page of 2