Instructions For Form 8835 - Renewable Electricity, Refined Coal, And Indian Coal Production Credit - 2015 Page 3

ADVERTISEMENT

2020. This doesn't include any facility for which any
Marine and hydrokinetic renewable energy facility
qualified small wind energy property expenditure (as
placed in service after October 2, 2008, and the
defined in section 25D(d)(4)) is used in determining the
construction of which begins before January 1, 2017.
residential energy efficient property credit.
A qualified facility doesn't include a refined coal
Closed-loop biomass facility placed in service after
production facility or landfill gas facility using municipal
October 22, 2004, and the construction of which begins
solid waste to produce electricity, if the production from
before January 1, 2017.
that facility is allowed as a credit under section 45K.
Closed-loop biomass facility modified to co-fire with
coal or other biomass (or both), placed in service before
Credit Period
January 1, 2017. The facility will be treated as modified
before January 1, 2017, if the construction of the
Credit period for
modification begins before January 1, 2017. See section
facilities placed in
Credit period for
45(d)(2).
service before
facilities placed in
August 9, 2005
service after August
Closed-loop biomass facility that is a new unit placed in
(years from
8, 2005 (years from
service after October 3, 2008, in connection with a facility
Eligible electricity
placed-in-service
placed-in-service
described in section 45(d)(2)(A)(i), but only to the extent
production activity:
date):
date):
of the increased amount of electricity produced at the
facility by reason of the new unit.
Wind
10
10
Open-loop biomass facility using cellulosic waste, the
Closed-loop biomass
10
10
construction of which begins before January 1, 2017.
Open-loop biomass
Open-loop biomass facility using agricultural livestock
(including agricultural
waste placed in service after October 22, 2004, and the
livestock waste
construction of which begins before January 1, 2017, and
nutrient facilities)
5
10
1
the nameplate capacity rating isn't less than 150 kilowatts.
Geothermal
5
10
Open-loop biomass facility that is a new unit placed in
service after October 3, 2008, in connection with a facility
Solar (pre-2006
facilities only)
5
10
described in section 45(d)(3)(A), but only to the extent of
the increased amount of electricity produced at the facility
Small irrigation power
5
10
by reason of the new unit.
Municipal solid waste
Geothermal energy facility placed in service after
(including landfill gas
October 22, 2004, and the construction of which begins
facilities and trash
before January 1, 2017. The facility doesn't include any
combustion facilities)
5
10
property described in Code section 48(a)(3) the basis of
Qualified hydropower
N/A
10
which is taken into account by you for purposes of
Marine and
determining the energy credit under Code section 48.
hydrokinetic
N/A
10
Solar energy facility placed in service after October 22,
2004, and before January 1, 2006. The facility doesn't
Indian coal
N/A
11
include any property described in Code section 48(a)(3)
Refined coal
10
10
the basis of which is taken into account by you for
The 5-year credit period for qualified open-loop biomass facilities (other than
1
purposes of determining the energy credit under Code
a facility described in section 45(d)(3)(A)(i) that uses agricultural livestock
section 48.
waste nutrients) placed in service before October 22, 2004, begins on
Small irrigation power facility placed in service after
January 1, 2005.
October 22, 2004, and before October 3, 2008.
Landfill gas or trash facility using municipal solid waste
placed in service after October 22, 2004, and the
United States and U.S. possessions include the
construction of which begins before January 1, 2017.
seabed and subsoil of those submarine areas that are
A refined coal production facility originally placed in
adjacent to the territorial waters over which the United
service after October 22, 2004, and before January 1,
States has exclusive rights according to international law.
2012. See Notice 2010-54 for more information on refined
coal facilities.
Who Can Take the Credit
Hydropower facility producing incremental hydroelectric
Generally, the owner of the facility is allowed the credit. In
production attributable to efficiency improvements or
the case of closed-loop biomass facilities modified to
additions to capacity described in section 45(c)(8)(B)
co-fire with coal, other biomass, or both, open-loop
placed in service after August 8, 2005, and will be treated
biomass facilities, and refined coal facilities, if the owner
as placed in service before January 1, 2017, if the
isn't the producer of the electricity, the lessee or the
construction of the improvement or addition begins before
operator of the facility is eligible for the credit.
January 1, 2017, and any other facility producing qualified
Specific Instructions for Part I and
hydroelectric production described in section 45(c)(8)
placed in service after August 8, 2005, and the
Part II
construction of which begins before January 1, 2017.
Figure any renewable electricity, refined coal, and Indian
Indian coal production facility placed in service before
coal production credit from your trade or business on lines
January 1, 2009.
13 through 28. Skip lines 13 through 28 if you are only
-3-
Instructions for Form 8835 (2015)

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Financial
Go
Page of 5