Environmental Checklist: 26 Other Infrastructure Projects Page 3

ADVERTISEMENT

Environmental Checklist: 26. Other Infrastructure Projects(3)
Category
Environmental Item
Main Check Items
Confirmation of Environmental Considerations
① Does the project comply with the country’s laws for rights of ethnic minorities
(5) Ethnic
and indigenous peoples?
4 Social
Minorities and
② Are considerations given to reduce the impacts on culture and lifestyle of ethnic
Environment
Indigenous Peoples
minorities and indigenous peoples?
① Are adequate measures considered to reduce impacts during construction (e.g.,
noise, vibrations, turbid water, dust, exhaust gases, and wastes)?
② If construction activities adversely affect the natural environment (ecosystem),
are adequate measures considered to reduce impacts?
(1) Impacts during
③ If construction activities adversely affect the social environment, are adequate
Construction
measures considered to reduce impacts?
④ If necessary, is health and safety education (e.g., traffic safety, public health)
provided for project personnel, including workers?
① Does the proponent develop and implement monitoring program for the
5 Others
environmental items that are considered to have potential impacts?
② Are the items, methods and frequencies included in the monitoring program
judged to be appropriate?
③ Does the proponent establish an adequate monitoring framework (organization,
(2) Monitoring
personnel, equipment, and adequate budget to sustain the monitoring framework)?
④ Are any regulatory requirements pertaining to the monitoring report system
identified, such as the format and frequency of reports from the proponent to the
regulatory authorities?
① Where necessary, pertinent items described in the Roads and Railways checklist
should also be checked (e.g., projects including access roads to the infrastructure
facilities).
Reference to
② For projects, such as installation of telecommunication cables, power line
Checklist of Other
Sectors
towers, and submarine cables, where necessary, pertinent items described in the
6 Note
Electric Power Transmission and Distribution Lines, and Oil and Gas Pipelines
checklists should also be checked.
① If necessary, the impacts to transboundary or global issues should be confirmed
Note on Using
(e.g., the project includes factors that may cause problems, such as transboundary
Environmental
waste treatment, acid rain, destruction of the ozone layer, or global warming).
Checklist
* For the communication infrastructure projects, applicable items are 1(1)(2), 3(1)(2), 4(1)-(5) and 5(1)(2), and only these items should be checked.
1) Regarding the term “Country’s Standards” mentioned in the above table, in the event that environmental standards in the country where the project is located diverge significantly from international standards, appropriate
environmental considerations are made, if necessary.
In cases where local environmental regulations are yet to be established in some areas, considerations should be made based on comparisons with appropriate standards of other countries (including Japan' experience).
2) Environmental checklist provides general environmental items to be checked. It may be necessary to add or delete an item taking into account the characteristics of the project and the particular circumstances of the
country and locality in which it is located.

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Life
Go
Page of 3