Va Form 26-1839 - Compliance Inspection Report Page 2

Download a blank fillable Va Form 26-1839 - Compliance Inspection Report in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Va Form 26-1839 - Compliance Inspection Report with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

CONTINUATION OF ITEMS 1, 2 OR 3
INSTRUCTIONS TO COMPLIANCE INSPECTOR
When making a compliance inspection the inspector must
Condition "D." (Noncompliance, builder does not intend to
have at hand reports of any previous inspections, approved plans
comply) is reported when the builder indicates unwillingness or
and specifications, and a statement of any specific offsite
inability to correct or complete items of noncompliance.
requirements for the property to be inspected. Other required
Condition "E." (Dwelling habitable, but completion of certain
references include HUD regulation in 24 CFR 200.962d. The
improvements will be delayed by conditions beyond control) is
inspector makes a careful examination of all improvements to
reported only at third inspection or thereafter; e.g. when all
ascertain whether or not the work is at the stage of completion
building improvements are complete except a concrete driveway,
required for the inspection being made, whether or not items of
walk and steps, which cannot be poured because of freezing
noncompliance listed on a previous report have been corrected,
weather.
and whether or not there have been any other variations from
plans, specifications or VA Minimum Property Requirements. If
When noncompliance, condition "C", has been checked at first
an inspection has been requested and the work has not progressed
or second inspection, the inspector indicates whether the item to
to such a point that the required inspection can be completed, a
be corrected or completed will be inspected at the next regular
report shall be prepared and distributed in the usual manner;
inspection or whether reinspection will be required. The check
however, the report shall indicate "Reinspection Required". If the
boxes at the bottom of Item 1 are used for this purpose. In these
work has progressed beyond the required inspection stage to such
cases reinspection is required when the work to be inspected will
an extent that significant items to be inspected have been
be concealed before the next
regular inspection.
When
concealed, the inspection will be deferred until the concealed
noncompliance or incomplete work, condition "C" or "E", is
work has been uncovered so as to permit satisfactory inspection.
reported at third inspection "Reinspection Required" is checked
The Compliance Inspection Report, VA Form 26-1839, is
in all cases.
completed as follows:
ITEM 2. This item is completed when making the regular
HEADING. The following entries are made: Property street
third inspection described in Item 1. Blank lines are provided for
address or lot and block number, builder's name and address and
reporting inspection findings with respect to offsite improvements
lender's name and address. The case number and veteran's name
such as walks, drives, streets and utilities, specified for the subject
and address are also entered if provided.
property. As in Item 1, condition "A", "B", "C", "D" or "E" is
checked and a description of the condition written in. Where
ITEM 1. The stage of construction at which inspection is
incomplete or unsatisfactory work is reported "Reinspection
being made is indicated by use of the appropriate check box. First
Required" is checked.
inspection is made at one of two alternative stages whichever has
been designated for the subject locality by the VA regional office.
ITEM 3. This item is used for reporting findings revealed by
"Special" inspection is checked in the case of alterations, repairs
an additional inspection occasioned by the requirement for
or additions to existing construction, and the inspector enters a
Reinspection made on a previous report. Entries are made in the
brief description of the stage of construction in the blank lines
manner prescribed under Items 1 and 2 above.
provided. Reinspection is checked in all cases wherein a previous
report has indicated "Reinspection Required".
ITEM 4. When condition "E" has been checked under Item
1 or 3, the inspector enters an estimate of the cost of finishing the
Under "Condition of Construction at this Inspection", the
incomplete onsite work and the expected date of completion. The
appropriate condition or conditions are checked in accordance
cost of any incomplete offsite work is not included.
with the following:
ITEM 5.
All inspection reports (First, Second, Third,
Condition "A." (No evidence of noncompliance observed) is
Special or Reinspection) are completed insofar as the inspector is
checked if the work has progressed to the inspection stage being
concerned by execution of the certification. It is to be noted that
reported upon and has been completed in accordance with plans,
the certification is so worded that final acceptance and approval is
specifications and Minimum Property Requirements. When this
not indicated at any stage. This affords the inspector or regional
condition is indicated, no further entries are made in Item 1 of the
office construction analyst the opportunity of reporting
form.
noncompliance which may have been overlooked at a previous
inspection.
If variations are observed, condition "B", "C", "D" or "E", or a
combination thereof is checked as appropriate. In these instances
SUBMISSION OF REPORT. An unapproved copy of all
the specific variations are listed in the blank lines provided and
reports is left at the job site for the convenience of the builder.
itemized by use of the letters "B", "C", "D" or "E", as they may
One copy is retained by the inspector for his or her case file. The
apply. Where appropriate, specific reference to sections of the
remaining copy is forwarded directly to the Valuation Officer,
regulations should be indicated. If additional space is required,
VA Regional Loan Center.
the carbons may be reversed and the back of the form used.
RECOMMENDATION TO VALUATION OFFICER, VA
Condition "B." (Substitutions or deviations) is reported where
REGIONAL LOAN CENTER.
When a report shows
variations from plans and specifications and/or deviations from
"substitutions or deviations" it must be submitted together with
the applicable Minimum Property Requirements are found to
an itemized statement by the inspector showing dollar differences
exist, regardless of whether or not costs are affected. When the
in construction cost occasioned by such changes.
builder is under contract with a veteran owner, a change order
signed by the veteran must be exhibited if this condition is to be
checked. In these cases the substitution or deviation is listed with
the notation "per veteran's change order".
Condition "C." (Noncompliance, builder will comply without
delay) is reported when unapproved variations are found and the
builder is willing and able to satisfactorily correct or complete the
work during the normal course of construction.