Dd Form 2737 - Industrial Capabilities Questionnaire Page 7

Download a blank fillable Dd Form 2737 - Industrial Capabilities Questionnaire in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete Dd Form 2737 - Industrial Capabilities Questionnaire with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

FOR OFFICIAL USE ONLY - BUSINESS SENSITIVE AND PROPRIETARY INFORMATION
INSTRUCTIONS
SECTION III - MANUFACTURED ITEM
d. Utilization - Government End Use.
(Continued)
Average hours per week, utilized to produce the
total quantities of all items intended for
9. Item - Factors of Production.
Government end use, for those constraining
production resources that formed the basis for
a. Resources for Required Production.
your response in 6.a. and 9.a., above.
Hours required to produce the specified quantity of
the surge item for each limiting factors of production
e. Current Capacity Utilization. Hours per
category (Production Equipment, Test Equipment,
week actually being used by each of the
Tooling, and Skilled Manpower). Consider which
constraining production resources that formed
piece of production equipment is utilized for the
the basis for your response in 9.a., above.
most hours to produce the surge item and respond
with respect to that piece of production equipment.
In other words, focus on the piece or group of
10. Competing Production Requirements.
production equipment, test equipment, tooling, and
skilled manpower that would be the first bottleneck
List the other planned items produced at this
limiting increased output of the surge item. (Ignore
site which are competing for resources required
production bottlenecks that are not the direct result
by the item being evaluated. Identify with an
of production equipment constraints and ignore
"X", in the appropriate production resource
competing demands for the production resources to
spaces, those resources used by these other
produce items other than the surge item.)
items which are also critical to the production of
the surge item under evaluation.
b. Utilization - Normal Operations. Hours per
week that constitute 100 percent utilization during
normal operations for those constraining production
11. Surge Factors of Production. Provide
resources that formed the basis for your response
order-to-delivery lead time (days) from new
in 9.a., above.
production for this item under surge conditions.
Assume this surge item is given top priority
c. Utilization - Surge Operations. Hours per
over all other production in your facility. Also,
week that constitute 100 percent utilization during
provide the lead time (days) for each of the
surge or emergency operations for those
constraining production resources that formed the
constraining production resources assuming
basis for your response in 9.a. above. Assume the
the suppliers of these resources are required to
surge or emergency operations would be sustained
give your order top priority. Assume the use of
for up to one year and an adequate supply of other
special incentives to attract skilled manpower.
factors of production would be available to support
maximum utilization of each of these production
resources.
DD FORM 2737, SEP 2007
Page 7 of 7 Pages
FOR OFFICIAL USE ONLY -
BUSINESS SENSITIVE AND PROPRIETARY INFORMATION

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 7