Notice For Commencement Of Earthworks (Nce) Within Vicinity Of High Voltage Cables - Sp Powerassets Page 2

ADVERTISEMENT

FORM NCE
6. Work’s
Detailed Location of
Details
Proposed Earthworks:
(Street Name and Reference number of House / Lamp Pole, etc)
Duration From:
To:
Nature of Earthworks:
Open Trench Excavation
Sinking of Earth Rod, Casing or Tubes
Boring, Dredging, Jacking, Levelling, Piling or Tunnelling
Soil Investigation
Others
(Please specify):
Cables Affected : HV / 400 / 230 / 66 / 22 / 6.6kV / LV as identified by LCDW
Depth of Earthworks:
meters
Distance of Work Area Boundary from Cables:
meters
Actual Commencement Date (DD / MM / YY):
Projected Completion Date (DD / MM / YY):
7. “Emergency”
Is the work under S80 (6)?
* Yes / No
Already Commenced?
* Yes / No
works
under
*(This refers to “work which is necessary to be carried out in the interest of public or private safety” as defined
Electricity Act
under S80 (6) of the Electricity Act. In such cases, this form must be submitted within 7 days after the earthwork
had commenced and must be endorsed by the Project Owner who authorised the work.)
Section 80(6)
Name and Designation Stamp of
Company Stamp / Signature / Date
Project Owner’s Officer-in-charge
a) Cable plans within the current validity period of 3 months have been obtained from SP PowerAssets Ltd.
8. Declaration
b) Cable detection was conducted at site by the above declared LCDW within the cable plan validity period.
(Please
read
c) Cable locations / routes have been marked out at site by the LCDW.
carefully)
d) My staff and I have been briefed by the LCDW on cable damage prevention measures.
e) I have briefed the supervisor(s), workers and excavator operator(s) on the measures to be taken to prevent cable
from being damaged.
f) I will inform EMCP (Tel: 6470 0653 / 658 / 659 / 663 / 686 / 604 / 605) when earthworks approach nearer to high
voltage cable location and RNE / RNW (Tel: 6470 3906) if cables with rating 66kV / EHVN (Tel: 6290 9121) if cables
with ratings 230kV and 400kV are affected.
g) In the event of a damage to electricity cables, I will stop all earthworks and immediately inform ESC at
Tel: 1800-778 8888.
h) I acknowledge that the Electricity Act applies, and hereby undertake to comply with all my duties and obligations
therein.
I hereby declare that I know and understand my duties under the provisions of the Electricity Act, and that the
information in this notice and any attached documents are true, correct and complete to the best of my knowledge. I
shall make myself readily contactable at the contact number given in this notice for the duration of the earthwork.
I consent to the collection, use and disclosure of my personal information by Singapore Power Limited and its
subsidiaries for the purposes of earthworks monitoring and earthwork-related activities.
Date
Applicant’s Signature and Company Stamp
9. Fees
A fee of $20.80 will be charged for each Notice for Commencement of Earthworks processed by SP PowerGrid Ltd.
An additional fee of $62.35 will be charged for consultation services provided by SP PowerGrid Ltd for sites where
earthwork is within the vicinity of high voltage cables. Total price: $83.15 per notice (inclusive of 7% GST). Payment
by NETS / cashcard / cheque. Cheque is to be made payable to “SP PowerAssets Ltd”.
not be processed and will be returned to the Applicant. NCE submitted must be within the validity period as
Incomplete Notice form will
declared in part 8(a) and 8(b). Please ensure that the following documents are attached with this submission.
a) Cable Detection Drawing (From your LCDW).
b) A sketch showing your proposed site plan.
c) The proposed work schedule.
d) All amendments must be endorsed by the Applicant. The NCE submission Authorisation Form must be completed and submitted to EMCP if the
person submitting the form on behalf of the Applicant is authorised by him to make amendments thereon when submitting to EMCP.
REV 07/14
SPPA Co. Registration No.: 200302108D
Page 2/2