M3 Series Unit Pre-Startup Checklist Form (Fillable)

Download a blank fillable M3 Series Unit Pre-Startup Checklist Form (Fillable) in PDF format just by clicking the "DOWNLOAD PDF" button.

Open the file in any PDF-viewing software. Adobe Reader or any alternative for Windows or MacOS are required to access and complete fillable content.

Complete M3 Series Unit Pre-Startup Checklist Form (Fillable) with your personal data - all interactive fields are highlighted in places where you should type, access drop-down lists or select multiple-choice options.

Some fillable PDF-files have the option of saving the completed form that contains your own data for later use or sending it out straight away.

ADVERTISEMENT

M3 Series Startup Form
Job Name:_______________________________________________
Date:______________
Address:______________________________________________________________________
______________________________________________________________________________
Model Number:_________________________________________________________________
Serial Number:_____________________________________________ Tag:_______________
Startup Contractor:______________________________________________________________
Address:______________________________________________________________________
_______________________________________________________
Phone:______________
Pre Startup Checklist
Installing contractor should verify the following items.
1. Is there any visible shipping damage?
Yes
No
2. Is the unit level?
Yes
No
3. Are the unit clearances adequate for service and operation?
Yes
No
4. Do all access doors open freely and are the handles operational?
Yes
No
5. Have all shipping braces been removed?
Yes
No
6. Have all electrical connections been tested for tightness?
Yes
No
7. Does the electrical service correspond to the unit nameplate?
Yes
No
8. On 208/230V units, has transformer tap been checked?
Yes
No
9. Has overcurrent protection been installed to match the unit nameplate
requirement?
Yes
No
10. Have all set screws on the fans been tightened?
Yes
No
11. Do all fans rotate freely?
Yes
No
12. Does the field water piping to the unit appear to be correct per design
parameters?
Yes
No
13. Is all copper tubing isolated so that it does not rub?
Yes
No
14. Have the damper assemblies been inspected?
Yes
No
15. Are air filters installed with proper orientation?
Yes
No
16. Have condensate drain and p-trap been connected?
Yes
No
Ambient Temperature
Ambient Dry Bulb Temperature ________°F
Ambient Wet Bulb Temperature ________°F
1

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 4