Project Report Template Lean Six Sigma Certification Page 5

ADVERTISEMENT

SSD Global, Inc.
Describe if you performed a measurement system analysis (Gauge R&R or Attribute), and
the outcome of this study.
If no MSA was performed, explain your reason for not
conducting one.
Capability Studies
Describe the outcome of the capability studies you were able to do as a result of your data
collection. What were some of the key observations? Include the “desired state” or future
capability targets.
Process Control
Include process control charts and related observations.
Tools Application
List the tools employed during this phase, and any key learning arising from the application
of the tools.
Refer to your Activity Sheet for a list of tools used in Measure
ANALYSIS PHASE
Your goal is to come up with 3-5 potential solutions based on the information you
gained in Define and Measure.
What charts will help you Analyze the data collected from Measure?
7 Quality Tools (fishbone, etc.)
Additional Charts Used by Lean Six Sigma such as VSM, Spaghetti, Swim Lane, Box plot?
When looking at potential solutions: (possibilities to help critical thinking)
List your Y = f(x) formula
Y = outcome for the potential solutions
X= the inputs necessary to achieve this solution
f is how the inputs must function
SWOT
What are the Root Causes?
Charts/graphs or logic
Is there any Correlations?
4

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business
Go
Page of 6