affect the Worship space must be approved by the assigned Liturgical Representative
and the Bishop. Change Proposals over $10,000 must be forwarded to the DPBC for
approval. (The attached Change Order Proposal form is provided for managing
Change Orders.)
4.
The pastor and the PPBC along with Architect/Consultant are responsible for
the administration and supervision of the construction contract, unless a Project
Manager has been hired.
5.
A Certificate of Insurance is forwarded to the DPBC to insure that the proper
insurance coverage for the project is provided.
6.
The Pastor receives one complete set of “As Built” Construction Documents to
include record drawings and specifications as well as all warranties and guarantees
and a second complete set is submitted to the DPBC for permanent storage in the
Diocesan Archives. The Parish maintains the original Record set.
VIII.
GRAND OPENING PHASE
1.
The Blessing and Celebration of the completed project is scheduled with the
Bishop’s office by the pastor. Contact the Office of Worship if the blessing involves
the Rite of Dedication or Rededication of a Church by the Bishop.
2.
Any adjustments or renovations made to a Church or its worship space
following dedication or rededication are to be accomplished in consultation with the
Office of Worship.
January 22 2008
8
Revised: October 26 2012