ANNEX F
AWS D1.2/D1.2M:2008
PROCEDURE QUALIFICATION RECORD (PQR)
Procedure Qualification Record no.______________________________________
Date ___________________
WPS no. _____________________________
Process(es) 1. ___________________
2. ___________________
Process(es)
1. ___________________
2. ___________________
_______________________________________________________________________________________________
Design Sketch
Welding Sequence Sketch
_______________________________________________________________________________________________
Base metals
Pass
Process
Travel
Group no. ______________
To _________________
No.
No.
Amps
Volts
Speed
Alloy and Temper ________
To _________________
Thickness ______________
To _________________
Filler metals
F-number ____________________________________
AWS class ___________________________________
Diameter ____________________________________
Shielding gas(es) ______________________________
Percent composition____________________________
Flow rate ____________________________________
Type of welding power source _____________________
Tungsten electrode (GTAW) ______________________
_____________________________________________
Size ________________________________________
Single or multiple electrode _______________________
Type ________________________________________
Stringer or weave bead __________________________
Backup type __________________________________
Welding current ________________________________
ac or dc
Alloy ________________________________________
Polarity ______________________________________
Backgouging _________________________________
Position of groove ______________________________
_______________________________________________________________________________________________
Cleaning procedure initial
Preheat
Oxide removal method __________________________
Preheat temperature ____________________________
Degreasing agent______________________________
Interpass temperature ___________________________
Cleaning procedure interpass __________________
_____________________________________________
Smut removal _________________________________
Postweld heat treatment ________________________
Dye penetrant removal ________________________
Original temper_________________________________
Final temper ___________________________________
Temperature ___________________________________
Time _________________________________________
Quench_______________________________________
Form F(b)
154