The layout & design / plans of public infrastructures such as park, entrance
plaza, toilets, educational facilities, food and beverage (F & B) retail
outlets, safari tram systems and other utilities etc.
The layout & design / plans of reticulation of service roads and footpaths,
security systems, electrical and fiber-optic system, potable and recycled
water, drainage, waste water and sewerage lines, also the sources of
electrical power (both conventional and alternate to be considered) potable
water (ground water) and sewerage treatment (oxidation, reed beds or
septic tanks).
The detailed Feasibility Study shall include the following: -
Topographic survey, contour mapping and preliminary soil
investigation
Environmental impact assessment
Economic & financial impact and evaluation / analysis, cost benefit
ratio and internal rate of return
Identify legal, institutional and regulatory framework
Assumptions and risks
Land use plan, study various international models, best practices
and proposed practical viable option
Total area of the safari park
Area to be developed
Location of infrastructures
Location of bus stop, taxi stands and public parking
Location of animal medical care center and other management
buildings
Location of public toilets
Sites for security posts, view decks and visitors shelters
Location of firefighting and disaster management systems
Identification and development of interventions / initiatives
Identification of transport facilities for visitors, adjoining communities
and stakeholders
Location of public call offices (public phones)
3