Instructions For Alaska Seafood Processor And Exporter License And Permit Application Intent To Operate - 1998 Page 5

ADVERTISEMENT

permits are necessary for a specific operation. In
Submit plumbing plans which meet the requirements
addition, the following ADEC permits may he
of 18
AAC 34.075 and toilet and handwash
required depending on the specific type and
requirements given in 18 AAC 34.085 or incorporate
volume of operation.
them into the facility plans if the information can be
shown clearly using color coded lines.
Other Permits
- Plan Review and Approval of Sewage
Water Supply and Ice Sample Results
For all facilities except direct market fishing vessels,
or Sewage Treatment Works
sampling must be performed and results submitted as
- Air Quality Control Permit to Operate
required in 18 AAC 34.080.
Contact your local
- Wastewater Disposal Permit
ADEC office for a list of approved laboratories and
- Solid Waste Management Permit
sample procedures.
- Plan Review and Approval of Public
Water Systems
Equipment and Utensils
- US EPA NPDES Permit
Submit
drawings
showing
placements
and
- Food Service Permit
specifications which meet the requirements of 18
AAC 34.070, 18 AAC 34.090, and 18 AAC 34.400.
In most cases, these permits and approvals can be
issued on the basis of information provided in a
Processing Waste Disposal
complete application. The Department will contact
Submit waste disposal details which meet the
an applicant if additional information is needed.
requirements of 18 AAC 34.075 and 18 AAC
34.095.
The permit issued by ADEC authorizes the
process activity described in the completed
Ingredients
application only.
Changes in ownership,
If you use two or more ingredients in processing or
additional processing operations, or facility
seafood formulation (dips, salmon hams, etc.), you
modifications may require an amended or
must submit a list of all ingredients and specify the
additional application and facility drawings to be
formulation that makes up the final seafood product.
submitted.
You may attach a copy of the label that you use for
the final product.
Required Submittals
Applications for new or recently modified
Thermal Processing
operations must furnish the following plans and
If you are thermal processing, provide a copy of the
specifications for their facility.
following: FDA Canning Establishment Registration
form; the schedule process from the processing
Shore-based Facility Plans
authority; the establishment code; and equipment
Submit profile and floor plan drawings that meet
specifications indicating compliance to 21 CFR Part
the requirements of 18AAC 34.070 or 18 AAC
113 or an approval letter detailing exceptions.
34.200 and are drawn to a reasonable scale (1" =
8 feet or larger) and applicable plot plan
NPDES Permit Requirement
information including a North point of the
If you discharge more than 1,000 lbs/day and more
compass as it relates to each drawing.
than 30,000 lbs/year of seafood processing wastes in
U.S. waters, you must have an U.S. EPA NPDES
Vessel Facility Plans
permit. If you don’t already have one and need an
Submit profile and deck drawings which meet the
NPDES permit, complete the following steps:
requirements of 18 AAC 34.070 or 18 AAC
Photocopy application pages 1, 2, 5, 7, and 8.
34.510 in a reasonable scale (1" = 4 feet or larger)
Make sure that you have completed all information
showing overall dimensions of the vessel.
requested on the pages.
Plumbing Plans
v
Instructions

ADVERTISEMENT

00 votes