Agenda Pre-Construction Conference Page 3

ADVERTISEMENT

13.
Defective Work will be brought to contractor and general contractor attention as soon as seen or
determined.
14.
Traffic Control
a. Traffic Control Subcontractor: ____________________________
15.
Soil Erosion / Sediment Control
a. Floodplain/Floodway On/Adj. to Site (Y/N)
b. WOUS or IWLC On/Adj to Site (Y/N)
c. Initial SE/SC Inspection at PreCon (Y/N)
d. Village to receive weekly DECI Inspection Reports (Y/N)
f. Key Discussion Items/Areas of Focus
Communication Chain
Construction Entrance
Detention/Sediment Basin
Dewatering
Ditch Checks/Silt Dikes
Dust / Mud Control
General Phasing
Inlet Protection
Inspection Log
Overland / Offsite
Perforated Riser
Perimeter SE/SC BMPs
Drainage
Silt Fence
Soil Stockpile
Restrictor Plate/Structure
(ASSHTO 288-00)
Stabilization
Stormwater Management
Stabilization Measures
SWPPP on Site & Updated
System
Wetlands/Waters
Stormwater System
Vegetative Cover/Type
Protection
16.
Temporary Facilities and Controls
a. Relocations (Utilities, roadway, etc.)
b. Job Trailer location, phone numbers, address,
17.
Testing (by Whom?)
a.
Materials
c.
Sewer Installation
b.
Water main Installation
d.
Pavement construction
18.
Chain of Command (contacts)
a.
Contractor
b.
Consultant
c.
Village of Mundelein
Safety – OSHA/IDOT
19.
- 3 -