Renovation Checklist

ADVERTISEMENT

 
 
RENOVATION CHECKLIST
 
 
Preparation by the homeowner prior to delivery of cabinets 
Remove old cabinets (this is responsibility of homeowner). 
Make all plumbing, heating and electrical changes. 
Complete replacement, relocation or removal of windows, doors and walls. 
Repair walls and ceilings. 
Remove old floor covering. 
Repair or replace sub‐floor. 
Remove all furniture and accessories from room or cover for protection. 
Remove appliances from room. 
 
Installation 
Delivery of cabinets. 
Installation of cabinets. 
Final measurements for countertops. 
Build countertop on site or install pre‐manufactured. 
Cut out for sinks, cook‐tops & wall ovens. 
Homeowner is responsible for supplying correct template ‐ there will be an extra charge for call backs. 
General clean up and final adjustment of doors. 
 
Completion of project by homeowners 
Installation of plumbing fixtures by plumbing contractor. 
Installation of light fixtures, appliances and trim by electrical contractor. 
Finish coat of paint by painting contractor. 
Installation of finish floor by flooring contractor.  
Final cleaning of interior and exterior of cabinetry, prior to use. 
 
 
 
 
 
 
 
 
 
 