Sample Renovation Recordkeeping Checklist

ADVERTISEMENT

Sample Renovation Recordkeeping Checklist
Name of Firm:
Date and Location of Renovation:
Brief Description of Renovation:
Name of Assigned Renovator:
Name(s) of Trained Worker(s), if used:
Name of Dust Sampling Technician,
Inspector, or Risk Assessor, if used:
___ Copies of renovator and dust sampling technician qualifications (training certificates, certifications) on file.
___ Certified renovator provided training to workers on (check all that apply):
___ Posting warning signs
___ Setting up plastic containment barriers
___ Maintaining containment ___ Avoiding spread of dust to adjacent areas
___ Waste handling
___ Post-renovation cleaning
___ T est kit or test results from an EPA-recognized laboratory on collected paint chip sample, used by certified
renovator to determine whether lead was present on components affected by renovation (identify method
used, type of test kit used (if applicable), laboratory used to conduct paint chip analysis, describe sampling
locations and results):
___ Warning signs posted at entrance to work area.
___ Work area contained to prevent spread of dust and debris
___ All objects in the work area removed or covered (interiors)
___ HVAC ducts in the work area closed and covered (interiors)
___ Windows in the work area closed (interiors)
___ Windows in and within 20 feet of the work area closed (exteriors)
___ Doors in the work area closed and sealed (interiors)
___ Doors in and within 20 feet of the work area closed and sealed (exteriors)
___ Doors that must be used in the work area covered to allow passage but prevent spread of dust
___ Floors in the work area covered with taped-down plastic (interiors)
___ Ground covered by plastic extending 10 feet from work area—plastic anchored to building and
weighed down by heavy objects (exteriors)
___ Vertical containment installed if property line prevents 10 feet of ground covering, or if necessary to prevent
migration of dust and debris to adjacent property (exteriors)
___ Waste contained on-site and while being transported off-site.
___ Work site properly cleaned after renovation
___ All chips and debris picked up, protective sheeting misted, folded dirty side inward, and taped for removal
___ Work area surfaces and objects cleaned using HEPA vacuum and/or wet cloths or mops (interiors)
___ Certified renovator performed post-renovation cleaning verification (describe results, including the
number of wet and dry cloths used):
___ If dust clearance testing was performed instead, attach a copy of report
___ I certify under penalty of law that the above information is true and complete.
Name and title
Date

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Life
Go