Master Production Scheduling
MPS:
January
Week
⌧weekly capacity
Product
1
2
3
4
requirements?
A
1000
1000
1000
1000
⌧Assembly: 1000*20 +
B
-
500
500
-
1500*22 + 600*25 = 68000
C
1500
1500
1500
1500
D
600
-
600
-
min = 1133,33 hr
⌧Inspection: 1000*2 + 1500*2
Bill of capacity (min)
+ 600*2,4 = 6440 min =
Assembly
Inspection
107,33 hr etc.
A
20
2
⌧available capacity per week
B
24
2.5
C
22
2
is 1200 hr for the assembly
D
25
2.4
work center and 110 hours
for the inspection station;
Capacity requires (hr)
Week
Available
capacity
per week
1
2
3
4
Assembly
1133
1083
1333!!
883
1200
Inspection
107
104
128!!
83
110