Forest Excise Tax Return Page 4

ADVERTISEMENT

INSTRUCTIONS FOR PAGE 1 (Summary)
Page 1 of the Forest Excise Tax Return is the Summary page. A Detail page (page 3) or several Detail pages will
need to be filled out before completing page 1. Detail page instructions are on page 2.
Errors and Omissions – If there are errors or omissions
Calculations:
in the pre-printed information on page 1, cross out the
Grand Total Taxable Stumpage Value – Add the
errors. Enter correct information.
Total Taxable Stumpage Value column. Enter the
No Harvest This Quarter – If you did not harvest timber
amount in the Grand Total Taxable Stumpage Value
this quarter, check this box. Or call 1-800-548-8829
block at the bottom of page 1.
during normal business hours. Or call our automated line
Tax Due – Multiply the Grand Total Taxable
1-800-547-9815, 24 hours a day, 7 days a week, from
Stumpage Value amount by the current rate (0.05) and
Washington, Oregon, or Idaho.
enter the tax due in this block.
All Harvesting is Completed – If harvesting is completed
EARR Credit – Add all amounts from the EARR
on all contract/permit numbers and you do not need to
Credit column on page 1. Enter this amount in the
receive future returns, check this box.
Less EARR Credit block.
Detail Page Number – You must fill out a separate detail
Subtotal – Subtract the EARR Credit from the Tax
page for each contract/permit. Identify by numbering this
Due. Enter this amount in the Subtotal block.
column to the corresponding detail pages you complete
Penalty – Return must be postmarked by the due date
(upper right hand corner of detail page).
to avoid penalties.
Check to Delete Contract/Permit – If harvesting is
Penalty Calculation: Subtotal multiplied by
completed on all sections of this specific contract/permit
appropriate penalty rate.
check this box.
Penalty rates:
CAUTION: A deleted contract/permit number indicates
harvest is completed for all sections under the
5% penalty assessed after due date;
contract/permit. It will no longer appear on your return.
15% penalty assessed after the last day of the month
Check to Delete Section – If harvest for this specific
following the due date;
section is complete check this box.
25% penalty assessed after the last day of the second
Check if No Harvest on this Section – If no harvest
month following the due date.
occurred on this specific section, check this box.
Total Amount Due – Subtotal plus Penalty equals
EARR Credit – Taxpayers are allowed a credit for timber
Total Amount Due. Make check payable to
harvested under a Department of Natural Resources
Department of Revenue. (If the subtotal is less than
(DNR) approved contract/permit subject to Enhanced
$50, send completed return without payment.)
Aquatic Resource Requirements (EARR). Look for the
Signature and Telephone Number – Sign your name,
yes or no in the EARR credit column on page 1 to see if
print your name. Enter your daytime telephone number
you’re eligible.
with area code. Enter the date. Enter your email address
(optional).
To request this document in an alternate format, call (360) 705-6715. Teletype (TTY) users may call (360) 705-6718.
Page 4
REV 62 0063
(07/03/12)

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Financial
Go
Page of 4