Operation And Maintenance Plan Template Page 23

ADVERTISEMENT

[Insert Dam Name]
Operations and Maintenance Plan
DRAIN OUTFALL/WEIR MONITORING TABLE
DRAIN OUTFALL/WEIR NO. ____________
Height of water
above weir
Discharge
Read
(feet)
(cfs)
Date
Time
By
Comments
Turbidity
Notes:
Use the follow ing equation to compute flow in gallons per minute (gpm): Q = 461.558 (H)
5/2
Where H = height (in feet, measured to nearest hundredth) of water flowing over the weir.
 

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal