Operation And Maintenance Plan Template Page 37

ADVERTISEMENT

Dam ID: HI-####
Inspection No:
Hawaii Reservoir
Date:
Month Day, Year
10. Outlet Works:
Culvert / Pipe
Type / Size:
Culvert:
 Concrete
 Masonry
 unlined earth
 Other
Pipe:
 DIP
 Corrugated Metal
 PVC
 HDPE
 Concrete
 Other
Control Type:
 Gate
 Valve
 Other
Location:
 Control on Upstream side
 Control on Downstream side
Seepage:
 Green Vegetation
 Wet or Muddy Ground  Ponding Water  Not Visible
 None Observed
 Flowing, Description:
Water Clarity:  Clear
 Some particles
 Muddy
 Other:
Description:
Findings:
 a. The outlet works were not tested
 b. The outlet works were not inspected
.
 c. Satisfactory – Expected to fulfill intended function – no corrective action required.
 d. Fair - Expected to fulfill intended function, but maintenance or other actions are recommended.
 e. Poor – May not fulfill intended function; maintenance, repairs, or other actions are necessary.
 f. Unsatisfactory – Is not expected to fulfill intended function; repair, replacement, or modification is necessary.
 g. Unknown – Not visible, not accessible, not inspected, or unable to determine based on the observation taken.
Corrective Actions:
 h. Seepage/Ponding water was observed. Conduct further investigation to locate the source of water and extent
of any possible hazardous or developing condition.
 i. Seepage was observed flowing and particles were observed to be removed by the flow. Take immediate
action to stop the loss of soil. Conduct further investigation to determine the underlining cause and take
corrective action. Monitor the area. Failures caused by seepage/piping along the outlet conduit are very
common and are considered to be a dangerous situation.
 j. Were not visible due to high grass and bush vegetation. Clear high vegetation and maintain low to enable
easy visual inspection.
 k.
 
Sheet 9 of 11

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal