Operation And Maintenance Plan Template Page 31

ADVERTISEMENT

Dam ID: HI-####
Inspection No:
Hawaii Reservoir
Date:
Month Day, Year
Physical Dam Features:
(Check All Applicable. Provide description of Items Observed and/or Take Photos. Indicate photo # in description.)
3. Reservoir:
Level during inspection
ft per
(gage / other)
Normal Operating Level/Range
ft per
(gage / other)
Description:
 Spillway always flowing  Kept within normal range
 Kept Empty  Drained Daily
 Only filled by Storms
Typical Operation
 Other:
 # Observed:
 Not Visible
 None Observed
Sinkhole in Res.:
Size:
by
in. Deep
Description:
Staff Gage:
Description:
Findings:
 a. The reservoir was not inspected.
 b. Satisfactory – Expected to fulfill intended function – no corrective action required.
 c. Fair - Expected to fulfill intended function, but maintenance or other actions are recommended.
 d. Poor – May not fulfill intended function; maintenance, repairs, or other actions are necessary.
 e. Unsatisfactory – Is not expected to fulfill intended function; repair, replacement, or modification is necessary.
 f. Unknown – Not visible, not accessible, not inspected, or unable to determine based on the observation taken.
Corrective Actions:
 g. The staff gage needs maintenance and/or repair. Description:
 h. A staff gage was not observed at the reservoir. Provide some method of quantifying the water level.
 i. A sinkhole was observed in the upstream reservoir. Conduct additional investigations and monitoring to
identify the cause, risk and appropriate action.
 j.
4. Inflow Works Description:
 Number of Inflows
 Inflow Culvert / Pipe
 DIP  Corrugated Metal  PVC  HDPE
 Concrete  Other
Size:
in.
 Gate  Valve
 Flow can either be Shut off or Bypassed
Control:
 Stream Diversion  Pump  Reservoir
 Other
From:
 Inflow Ditch / Flume
Dimension:
(Size x Depth)
Shape
 Dirt
 Wood
 Concrete
 Lined w/
Surface:
 Gate  Valve
 Flow can either be Shut off or Bypassed
Control:
 Stream Diversion  Pump  Reservoir
 Other
From:
Findings:
 a. The inflow works were not inspected.
 b. Satisfactory – Expected to fulfill intended function – no corrective action required.
 c. Fair - Expected to fulfill intended function, but maintenance or other actions are recommended.
 d. Poor – May not fulfill intended function; maintenance, repairs, or other actions are necessary.
 e. Unsatisfactory – Is not expected to fulfill intended function; repair, replacement, or modification is necessary.
 f. Unknown – Not visible, not accessible, not inspected, or unable to determine based on the observation taken.
Corrective Actions:
 g. The inflow works needs maintenance and/or repair. Description:
 h.
 
Sheet 3 of 11

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Legal