Dam ID: HI-####
Inspection No:
Hawaii Reservoir
Date:
Month Day, Year
6. Crest:
Approximate Crest Width:
Access:
 None  Walking Path
 Roadway, Surface / Width / Usage:
Erosion:
 Loose soil w/ little vegetation  Rut (<6”)  Gully (>6” deep)
 Not Visible
 None Observed
Description:
Cracks:
 Parallel with crest
 Perpendicular to crest
 Slide visible
 Not Visible
 None Observed
Description:
Sinkholes:
 Not Visible
 None Observed
in. Wide
x
in. Long
x
in. Deep
Description:
Vegetation:
 None  Low Ground Cover
 Bushes or Tall Grass
 Trees #
 <6”
 >6” & <20”
 >20”
Description:
Findings:
 a. The crest was not inspected.
 b. Satisfactory – Expected to fulfill intended function – no corrective action required.
 c. Fair - Expected to fulfill intended function, but maintenance or other actions are recommended.
 d. Poor – May not fulfill intended function; maintenance, repairs, or other actions are necessary.
 e. Unsatisfactory – Is not expected to fulfill intended function; repair, replacement, or modification is necessary.
 f. Unknown – Not visible, not accessible, not inspected, or unable to determine based on the observation taken.
Corrective Actions:
 g. Access along the crest was satisfactory.
 h. Access along the crest was not possible. Description:
 i. Rut and/or Gully erosion was observed on the crest, which requires maintenance and/or repair.
Description:
 j. A crack was observed on the crest, which requires further investigation to determine the underlining cause.
Monitor the area and/or repair as required.
 k. A sinkhole was observed on the crest, which requires further investigation to determine the underlining cause.
Repair and monitor the area.
 l. Portions of the crest were not visible due to high grass and bush vegetation. Clear high vegetation and
maintain low to enable easy visual inspection.
 m. Tree(s) were observed on the dam embankment. Trees have been identified as the probable cause of piping
failures, and can possibly cause severe damage to the embankment if they are uprooted during a high winds.
Corrective action is required to remove the tree hazards from the dam. All repair work shall be accomplished
as per the requirements of licensed geotechnical or civil engineer. Routinely monitor the damaged area for
signs of settlement and seepage.
 n.
 