Dam ID: HI-####
Inspection No:
Hawaii Reservoir
Date:
Month Day, Year
2. Questions for Owner’s Rep.:
Yes No Unknown Comments
Construction Plans Available
Site / Facility Map
Operation & Maintenance Manual 
Emergency Action Plan
Modifications / Improvements
Conduct Routine Inspections
Conduct Routine Maintenance
Vehicle access to site
 Not accessible
 With Standard car
 Requires 4-Wheel Drive
Access during heavy rains
 Not accessible
 With Standard car
 Requires 4-Wheel Drive
Access when spillway is flowing
 Not accessible
 With Standard car
 Requires 4-Wheel Drive
Incident History
 Breached  Overtop  Slide
 Down stream Flooding
 Other:
Reservoir’s Current Use
 Sediment  Irrigation  Recreation
 Flood Control
 Drinking Water
 Power Generation
 Other:
Findings and Corrective Actions:
 a. The Owner shall maintain documentations including Construction plans, specifications, improvements,
modifications, Operations and Maintenance Manuals and routine inspection logs for this dam facility.
 b. An Emergency Action Plan (EAP) is on file with the department, submit any updates as applicable.
 c. An EAP is required for High and Significant Hazard Dams. Submit an updated EAP for this facility.
 d. An EAP is recommended for all dams regardless of hazard class. Submit EAP if developed for the facility.
 e. Submit current Operations and Maintenance Manual or Procedures for this dam / reservoir facility.
 f. Submit Site or Facility Map of this Dam which identifies the location of major features including outlet works
controls and conduits.
 g. Submit narrative and additional information detailing the improvements, modifications, and/or alterations at the
dam site, unless covered by approved dam permit.
 h. Routine inspection logs were not inspected.
 i. Dam owners shall provide for routine inspection of the dam.
 j. The dam did not appear to be maintained on a regular basis.
 k. Access to site appears to be satisfactory.
 l. There is no vehicular access to the dam site. Operational and emergency plans need to reflect this deficiency
or access provided.
 m. Access to dam is questionable during severe weather conditions and/or spillway overflows. Operational plans
and emergency plans need to reflect this deficiency or access provided.
 n. Provide a detailed narrative of the incident, responses taken, and any damages incurred. Dam owners are
required to promptly advise the department of any sudden or unprecedented flood or unusual or alarming
 o.
Additional Requirements:
The following investigative study(s) are:
Required Recommended
Phase I Study
Hazard Classification
Emergency Action Plan (EAP)
Hydrology and Hydraulics (including Probable Maximum Flood and spillway capacity)
Seepage Analysis
Stability Analysis
Seismic Analysis
Other:
 