Basis Of Estimate Page 14

ADVERTISEMENT

United States Department of the Interior
National Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
Project:
Oso Comida Trailhead Improvements:
Estimate By:
YtB
Park:
Bear Arbor NRA
Date:
01/12/11
Park Alpha:
BEAR
Reviewed By:
BBB
PMIS:
XXXXXX
Date:
01/17/11
Summary Item: D20 Plumbing Systems
Total Cost:
$42,776
MATERIAL
LABOR
EQUIPMENT
TOTALS
Uniformat II WBS
Total
Description
Quantity
Unit
Material
Total Material
Labor
Total Labor
Equipment
Total
Code
Equipment
Total Cost
Cost/Unit
Cost
Cost/Unit
Cost
Cost/Unit
Cost/Unit
Cost
D2030
SANITARY WASTE
22.13.16
4" Waste Collection Trunk line
80
LF
$
17.92
$1,433
$
26.21
$2,097
$
-
$0 $
44.12
$3,530
22.13.16
Floor drains
4
EA
$
349.87
$1,399
$
120.00
$480
$
-
$0 $
469.87
$1,879
22.13.15
2" Waste Collection to Floor Drains
40
LF
$
13.83
$553
$
24.00
$960
$
-
$0 $
37.83
$1,513
Fitting Allowance 10%
1
Allow
$
419.77
$
-
$
-
$0 $
419.77
22.13.16
$420
$0
$420
$
-
$
-
$
-
$0 $
-
$0
$0
$0
SANITARY WASTE
1000
$
3.81
$3,806 $
3.54
$3,537 $
-
$0 $
7.34
SUBTOTAL
SF
$7,342
Summary Item: D20 Plumbing Systems
MATERIAL
LABOR
EQUIPMENT
TOTALS
Uniformat II WBS
Total
Description
Quantity
Unit
Material
Total Material
Labor
Total Labor
Equipment
Total
Code
Equipment
Total Cost
Cost/Unit
Cost
Cost/Unit
Cost
Cost/Unit
Cost/Unit
Cost
D20
Plumbing Systems
1000
SF
$
26.65
$26,655
$
16.12
$16,121
$
-
$0
$
42.78
$42,776
14 of 38
BEAR Trailhead - 100% Draft Class A Cost Estimate, Item 1-D20 Plumbing
1/24/2011 2:13 PM

ADVERTISEMENT

00 votes

Related Articles

Related forms

Related Categories

Parent category: Business