United States Department of the Interior
National Park Service
Class A Construction Cost Estimate
LINE ITEM COST SUMMARY
Project:
Oso Comida Trailhead Improvements:
Estimate By:
YtB
Park:
Bear Arbor NRA
Date:
01/12/11
Park Alpha:
BEAR
Reviewed By:
BBB
PMIS:
XXXXXX
Date:
01/17/11
Summary Item: G30 Site Mechanical Utilities
Total Cost:
$163,337
MATERIAL
LABOR
EQUIPMENT
TOTALS
Uniformat II WBS
Total
Description
Quantity
Unit
Material
Total Material
Labor
Total Labor
Equipment
Total
Code
Equipment
Total Cost
Cost/Unit
Cost
Cost/Unit
Cost
Cost/Unit
Cost/Unit
Cost
G3010
WATER SUPPLY
33.21.13
Drill water well
1200
VLF
$0
$
14.39
$17,265
$
31.68
$38,016 $
46.07
$55,281
Install 8" Casing
1200
VLF
$
22.50
$
2.50
$
0.75
$900 $
25.75
33.21.13
$27,000
$3,000
$30,900
33.21.13
Install 2" Well pump
1
EA
$
641.89
$642
$
150.00
$150
$
100.00
$100 $
891.89
$892
33.21.13
2" HDPE pump riser
1200
VLF
$
3.50
$4,200
$
-
$0
$
-
$0 $
3.50
$4,200
22.11.13
2" Supply Line to building
150
LF
$
3.50
$525
$
2.50
$375
$
4.00
$600 $
10.00
$1,500
22.11.19
Pressure equilization tank in Building
1
Ea
$
250.00
$250
$
100.00
$100
$
50.00
$50 $
400.00
$400
33.21.13
Pump control system with alarm
1
Allow
$
250.00
$250
$
100.00
$100
$
50.00
$50 $
400.00
$400
$
-
$
-
$
-
$0 $
-
$0
$0
$0
WATER SUPPLY
1000
$
32.87
$32,867 $
20.99
$20,990 $
39.72
$39,716 $
93.57
SUBTOTAL
SF
$93,572
MATERIAL
LABOR
EQUIPMENT
TOTALS
Uniformat II WBS
Total
Description
Quantity
Unit
Material
Total Material
Labor
Total Labor
Equipment
Total
Code
Equipment
Total Cost
Cost/Unit
Cost
Cost/Unit
Cost
Cost/Unit
Cost/Unit
Cost
G3020
SANITARY SEWER
33.36.13
Install Septic King Tank & Treatment system
1
LS
$ 46,000.00
$46,000
$
4,500.00
$4,500
$
2,500.00
$2,500 $ 53,000.00
$53,000
33.36.13
Excavate Leach Field
90
CY
$0
$
11.20
$1,008
$
3.80
$342 $
15.00
$1,350
33.36.13
Install Leach Field Chamber System
16
EA
$
395.00
$6,320
$
265.00
$4,240
$
72.50
$1,160 $
732.50
$11,720
Backfill with Drain Rock
25
Tons
$
23.50
$
19.50
$
8.50
$213 $
51.50
33.36.13
$588
$488
$1,288
Common Backfill Leach Field Mound
90
CY
$
-
$
11.20
$
3.80
$342 $
15.00
33.36.13
$0
$1,008
$1,350
36.31.13
Sewer outfall from building
75
LF
$
5.85
$439
$
4.65
$349
$
3.60
$270 $
14.10
$1,058
$
-
$0
$
-
$0
$
-
$0 $
-
$0
$
-
$
-
$
-
$0 $
-
$0
$0
$0
SANITARY SEWER
1000
$
53.35
$53,346 $
11.59
$11,592 $
4.83
$4,827 $
69.77
SUBTOTAL
SF
$69,765
Summary Item: G30 Site Mechanical Utilities
MATERIAL
LABOR
EQUIPMENT
TOTALS
Uniformat II WBS
Total
Description
Quantity
Unit
Material
Total Material
Labor
Total Labor
Equipment
Total
Code
Equipment
Total Cost
Cost/Unit
Cost
Cost/Unit
Cost
Cost/Unit
Cost/Unit
Cost
G30
Site Mechanical Utilities
1000
SF
$
86.21
$86,213
$
32.58
$32,582
44.5425
$44,543
$
163.34
$163,337
20 of 38
BEAR Trailhead - 100% Draft Class A Cost Estimate, Item 1-G30 Site Mechanical
1/24/2011 2:13 PM